Font Size: a A A

Research On Fund Operation Mode Of Infrastructure Construction

Posted on:2012-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:L X YangFull Text:PDF
GTID:2269330401977443Subject:Accounting
Abstract/Summary:PDF Full Text Request
With our country economy development, infrastructure construction speed growsubsequently. Since most of the infrastructure projects have natural monopoly andquasi-public goods characteristic, infrastructure construction need government control.Because the government strained resources and business inefficient cause constructionfunds shortage, government bond defaults construction unit, to make constructionenterprises, the production management enterprise and business enterprise happening tomanage difficulty and unpaid wages, generates a series of problems, such as, affecting themarket economic order and social stability. Meanwhile construction process of lack ofstandardized and effective investment in operate, the government in the construction ofinfrastructure construction project showed high consumption and low efficiencycharacteristic. Therefore strengthen management, perfecting supervision mechanism, andexplore new infrastructure projects construction fund operation mode has imperative.In practice,DaGuang highway and China construction bank cangzhou branch explores akind of project construction fund running new ways--the "engineering factoring " coverthe of shortage government infrastructure investment, It also can reduce the risk ofinfrastructure construction, guarantee the smooth progress of the construction of the project,and have achieved good economic and social benefits. This business is a reference to theinternational trade settlement, the factoring in engineering construction receivabledevelopment of a settlement with innovative financing. This paper analyzes the backgroundof the business, introduces the engineering insurance "business and to realize the mode ofoperation of the owners, the construction unit, Banks and government multi-win situationmechanism is discussed. It also analyzes the business potential risks, according to theserisks, advances some corresponding avoidance."Engineering factoring" businessinfrastructure construction project opened up a new way of short-term financing forconstruction funds, also provides a new mode effective operation.
Keywords/Search Tags:Infrastructure construction, Engineering factoring, Fund Operation modes
PDF Full Text Request
Related items