In order to meet today’s Chinese electric power technology development and the needs of electricity customers, the State Grid put forward the smart grid planning and construction and development tasks, and require establishing electricity information acquisition system in different places. Due to the electricity information acquisition system has not formed a standard, Shenyang Power Supply Company emerged some problems such as inaccurate distributing the card, not locking meter reading period, mismatching all aspects. This paper puts forward problems, analyze, solve problems and evaluate problemss logical method in Shenyanng power supply company, the electricity information acquisition system are analyzed.First of all, a full analysis for the causes of the problems is given. According to the correlation theory of information class projects, the comprehensive analysis and relevant cases are researched. And combined with electricity information acquisition and management theory in the smart grid development strategy.Then, through the analysis of the failure causes with the fishbone diagram and the theory of project management, the body process for project construction is given. Project management matrix is used for the job responsibilities in the improvement program. In addition, the correlative strategy and management plans are drawn up. The project risk management and quality control are also used to analyze the project construction. Finally, economic benefit analysis, social benefit analysis and brief introduction to work afterwards are also given. |