Font Size: a A A

Risk Point Control Of The Electric Power Enterprise Bidding And The System Development Of Process Management

Posted on:2014-08-12Degree:MasterType:Thesis
Country:ChinaCandidate:J WangFull Text:PDF
GTID:2268330425475847Subject:Control Engineering
Abstract/Summary:PDF Full Text Request
Along with our country market economy establishment and development of the tender as away of purchasing the most market, more and more widely applied. However our country executesproject bidding time is not long, the bidding business is still in its infancy, the operation is notenough standardization in the engineering, goods bidding, bidding management to strengthen.The bidding transaction must be run under the fair competition of the market economymechanism. Public bidding project builds a buyer’s market, can form the seller of competitionsituation, only in this way, the buyer was able to occupies the dominant position, conditional onthe bidding way preferred to choose the winner from the many competitors. For the biddingprocess as the research object, this thesis is to be possible irregularities in the tender process as adisturbance, the bidding system of process control model is established. And with a load in thepower system, power construction engineering project and related material purchasing biddingprocess, for example, by a diagram of the bidding management process design bidding processcontrol, against possible risks related links (disturbance).On the basis, targeted control strategy isproposed.The main research content of this article:(1) Electric power construction engineering project and related material purchasing biddingmain risk analysis.(2) Electric power construction engineering project and related material purchasing biddingmain risk control strategy.(3) The relevant bidding management system.(4) Electric power construction project and its related material purchasing bidding riskmanagement platform.(5) Online bidding system development.
Keywords/Search Tags:Bidding, Process management, Information system, Electric power construction
PDF Full Text Request
Related items