Font Size: a A A

Study On The Yungang Feeder Capacity Expansion

Posted on:2014-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:N ShenFull Text:PDF
GTID:2252330428979058Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
Based on the optimization and improve efficiency, and strive to better than this strategic goal for the realization of quadrupling2000GDP by2020, the need to transport and energy security for the solid foundation."3on the west"(Shaanxi, Shanxi, Inner Mongolia) is an important coal base in China, coal sales accounted for40%of the total national coal Sinotrans, the volume of the main rail based transport.This thesis is on the basis of analyzing the present situation of Yungang branch, calculated by reference and theoretical experience revamping of existing lines, to optimize scheme, determine the Yungang feeder capacity strengthening scheme, and the implementation of specific programs for the late, and ultimately to the feeder transportation Yungang capacity strengthening effect analysis, the measures, seize the development opportunities for research. Status of the Yungang regional operation organization mode are analyzed, the Yungang branches and lines of the station basic situation, analysis the present situation of the Yungang west station operation organization of the Yungang station, transportation organization, focus on the whole of the Yungang regional problems and causes were analyzed. Discusses the theory and method of strengthening the railway transport capacity, the capacity of the existing, to predict the future of the region, the possibility of revamping the Yungang branch. The theory and method of the railway transport capacity was studied, the Yungang branch (Yungang station to the west station room) problems, the factors to the Yungang station to the railway station and the station line transformation are briefly introduced in this paper, draw on the advanced experience of the revamping of the predecessors, discussed the transformation of the Yungang station to the railway station and the station line of site selection and division of the three plan, the three schemes are compared, and ultimately selected the Qingciyao special line scheme and implementation details. Through theoretical calculation and actual construction verification, proved the feasibility of the design scheme. Discusses the whole line capacity strengthening analysis results through the Yungang regional expansion and reconstruction, the whole line capacity increase and experiences.
Keywords/Search Tags:Revamping, Reconstruction of existing railway, Transportationorganization, Passing capacity
PDF Full Text Request
Related items