Project management as a discipline widely used, can be studied from various angles, the paper only from project planning and control of angles, according to the actual situation of the project, selected S Air Conditioning Engineering Vocational College Complex Project Management as a research object discussed. Thesis, project management theory and methods, combined with on-site S Vocational School Complex, air conditioning project implementation progress, project schedule on the principles and control processes and methods used in engineering practice.Paper introduces the research background and significance of this paper, a brief summary of project management theory and methods in the planning and control of the progress of the S Vocational School Complex in the air conditioning works, the needs of the application. Papers on the use of network planning technology S Air Conditioning Engineering Vocational College Complex project schedule has been compiled to determine the project critical path, the path of the total duration of326days. Under the premise of a balanced consideration of resources, the establishment of a fixed duration-resource leveling optimization model, indicating that the idea of the project plan optimization, graphical method and related software applications to complete the optimization of the initial project schedule, project schedule control is to lay a good foundation. When control of the project schedule, the paper introduces the earned value method, through the progress of the project’s progress in a timely manner deviation analysis, drawn up to31December2013the project schedule deviation of2.96million yuan, seriously behind schedule conclusions illustrate a strong role in the evaluation of earned value method aspects of project progress. Finally, by taking to the air conditioning works air duct system installation and water system pipe welding two aspects of control measures, improve the efficiency of construction projects with an estimated final project schedule variance of34million, more than2.96million yuan to adjust the square in front of the lower262million. This paper analyzes the air conditioning works while S Vocational School Complex project during the construction of implementing countermeasures, including project organization and management, project preparation and project construction quality construction in three aspects.Scientific preparation schedule and controlled, reducing uncertainties and changes in circumstances development projects in progress, so that the project completed on schedule, will help improve the core competitiveness of enterprises, improve enterprise management level. In this paper, S Air Conditioning Engineering Vocational College Complex project for the study, discussed in detail the progress of the project planning process and its control method, not only for the project later in the project management provides an important reference for other similar projects also has an important promotion of significance. |