Font Size: a A A

Changchun New Asphalt Mixing Plant Project Comprehensive Benefit Analysis

Posted on:2015-03-20Degree:MasterType:Thesis
Country:ChinaCandidate:W Y ChenFull Text:PDF
GTID:2252330428967194Subject:Project management
Abstract/Summary:
Taking changchun new asphalt mixing plant construction projects (constructioninvestment from changchun SD construction engineering co.,LTD) as an object for projectinvestment benefit analysis,the project to meet changchun north city,xicheng district,southwest of the city and the surrounding city,township road asphalt concrete as the goal.Since the implementation of the project of changchun north city,xicheng district,southwestof the city,including wide,green city park,chaoyang district,high-tech zone andsurrounding rural areas of asphalt concrete requirements will be met,and provide solidfoundation for new construction,reconstruction of old town. The new asphalt mixing plant,after the completion of the project will all the regional urban traffic road asphalt concreterequirements are met. In this paper,the changchun new asphalt mixing plant and productionprocess,investment analysis,financial analysis,economic analysis,social analysis one byone,its fundamental purpose is to maximize the chance that changchun SD constructionengineering co.,LTD.,the return on investment,through good balance of payments andenterprise credibility,thereby creating changchun city districts and cities supporting level,ensure the changchun municipal party committee municipal government,each region,eachbig the premise condition of investment promotion and capital introduction,national andprovincial development zones to delisting of the project in the future and the normaloperation of other projects in the area of travel,transportation,and the daily production need.So will replace the new asphalt mixing station behind the severe pollution of the old asphaltmixing plant,with the existing old urban area and the surrounding into asphalt mixing plant,rational utilization,resources reorganization rebuild scientifically,not only improve thecomprehensive utilization of changchun city area of land,more demand to improve theinvestment environment and residents living environment demand. Especially the urbanresidents,good living environment,convenient transportation,urban development isparticularly important at present.Local policy safeguard,relationship between the new asphalt mixing plant return on investment of the project,national and local policy guidance,greatly reduce and avoid theproject location in various risks in the process of construction investment,so as to achieveurban infrastructure supporting the implementation of scientific layout and continuousconveying of asphalt concrete. In this paper,a comprehensive analysis of changchun newasphalt mixing plant project relevant government policies and standards in the region andfavorable conditions under the premise, to the project site selection, planning andconstruction budget cost,technology,investment analysis,financial analysis,economicanalysis,social analysis of scientific reasoning,one by one to clarify,and the investmentbenefit of changchun new asphalt mixing station project is analyzed to give,for this projectis feasible and eventually to build a correct conclusion as soon as possible.In this article,through changchun new asphalt mixing plant project and new productiontechnology and environmental protection technology,technical support,project investmentanalysis,financial analysis,further to the study of changchun city buildings surrounding thenew asphalt mixing plant project and location area,geological features,distinguish betweenplanning,industrial materials market,form a complete set of business area,residents,so asto achieve the region to the requirement of environmental pollution and noise pollution. Atthe same time in changchun city and surrounding towns of asphalt concrete demand andtransportation radius overall understanding the actual situation,scientific and reasonablestatistical asphalt mixing station all aspects of the data of the project,to reduce cost,improveproject profit,realize the tax,finally achieve the premise of changchun city planningpurposes and functions.Through scientific computing,changchun point,about23.1%of new asphalt mixingplant project (value) reaches producing,fully shows the changchun SD constructionengineering co.,LTD investment of the construction of the new asphalt mixing plant projectas long as the asphalt concrete production amounted to23.1%of design capacity,benignoperation,can achieve the project’s investment break-even point. It is not hard to conclusion-the new asphalt mixing plant project has the strong ability to resist risk and profitability.Changchun SD construction engineering co.,LTD has strong economic strength,theenterprise has for years been has a good reputation in the society. At the same time,theenterprise has the certain asphalt mixing knowledge related personnel and professional team,professional and strong technical force,perfect technology,advanced team,excellentstaff ratio,especially the core technical personnel,has the rich actual combat experience andstrain capacity. On the funding side,because the enterprise investment of the new asphaltmixing plant project construction scale and the money supply moderately,from constructioninvestment to the production of returns are mature,advanced,more to have good financialsecurity and good market expectations and good technical support,so the changchun SDconstruction engineering co.,LTD of new asphalt mixing station project investmentconstruction is scientific and feasible.
Keywords/Search Tags:New asphalt mixing station, The new technology, Investment Benefit Analysis, Financial benefit Analysis, Economic benefit Analysis, Social benefit Analysis
Related items