| Post project evaluation is an important part of project management, refers to theevaluation of projects that have been completed, including the project preparation,implementation process and content completion after the construction management etc.. Inthe project post evaluation, we can compare the project plan goal and the actual situation, inorder to determine the project planning activities and determine whether accurate, find outthe reasons of the deviation, on the basis of summing up the experience, reflection, and theinvestigation results as the effective feedback information to develop strategies and measuresthe following. It helps to improve project planning, strengthen supervision of the project,improve the project implementation and management, to maximize the project investmentbenefit.After the power supply capacity and quality of Shangzhi area power grid from1998implementation of rural and urban network construction and transformation has beensignificantly improved, with good economic and social benefits of Shangzhi City66KVsubstation reconstruction project, provide support to the economic development of the region.Based on the domestic and international research of project post evaluation of dynamic,relevant theory and method generalizes the project post evaluation, the connotation,characteristics and methods were introduced in detail; then introduced the variable ofShangzhi Metro66KV uprating project; and finally the use of project post evaluation theoryand method of the project implementation, environmental impact, economic benefits, and thesustainability of post evaluation research. The evaluation results can be seen, theconstruction of substation reconstruction project is successful, it made the actual effect, theobjectives are to achieve the desired, and achieved good economic and social benefits,improve the power supply capacity of the new variable, power supply reliability and theoperation stability. Made a great contribution to the promotion of local economicconstruction, planning, construction and management of the project has certain referencesignificance to formulate policy power energy policy relevant, the scientific and reasonableevaluation of the substation project is of great practical significance: first, the accumulationof experience, the construction and renovation of investment for the future; two, referenceexperience for the follow-up investment decision; three, verify the project contribution to thesocial economy; four, provides a high reference value to other research projects substation capacity variable evaluation staff. |