Font Size: a A A

Lanshi Group Construction Of The New Power And Energy Planning And Design

Posted on:2013-04-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhaoFull Text:PDF
GTID:2252330395478272Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
Responsing to the call of the government, new construction of Lanshi group is a major move of obtain new development, achieve again brilliant, create billions benefit. The factory is located in the old city, building high density, population, traffic congestion, pollution is serious, the energy supply is limited, a public municipal facilities, building layout and environmental problems and contradictions have become increasingly prominent, in addition to the market influence, subject to geographical constraints, development is limited, difficult to grow. Group construction of the new power and energy planning and design in the use of new technologies, new resources, to meet the new energy security on the basis of old quarter, solve problems and improve the efficiency of energy saving.In this paper,according to the new industrial park supporting infrastructure projects in the planning and construction, the current situation of the enterprise, the company a variety of energy demand and the process parameters were investigated, all kinds of kinetic energy on how to introduce the park, how to optimize configuration, energy efficient, and various types of energy supply by what way, doing experiments and economic feasibility of transformation analysis.This paper also study the Industrial Park power and energy planning on-the-spot survey, The results show that, the heating should be used in central heating and red infrared heating combination mode, namely civil and office use of centralized heating by hot water heat pipe; tall plant using natural gas as energy, an infrared heating equipment, both energy saving and cost saving investment. Water supply system in the park in the setting of pipe network, using the new water treatment system, with each unit process requirements and a circulating water pool, make full use of water resources, the scarcity of water resources to solve new problem, influence of Park development. The factory power supply design is not only to meet the specific requirements of the production process is put forward, to ensure safe and reliable to provide electrical energy, and strive to be reasonable, less investment, low operating cost, thus the internal grid operation status of comprehensive scientific analysis, to the enterprise network optimization operation and put forward some suggestions. Oxygen, acetylene and other gases for special use of energy, the energy cooperation models, and supply manufacturers signed long-term supply contracts, the interior are no longer new gas station and gas pipeline, the bus or the storage tank of direct supply, has advantages of saving investment, less land occupation, high security advantages.In the above theoretical analysis and experimental research, this paper presents a group of new construction of power and energy planning and design requirements and model...
Keywords/Search Tags:planning of power and energy, heating mode, recycling water system, powersupply design, special gases
PDF Full Text Request
Related items