With the implementation of the western development strategy, Infrastructureinvestment and construction of ningxia hui autonomous region counties, construction ofkey projects. The sewage treatment project has completed and put into operation, Therecycled water reuse the arid region of ningxia speaking is necessary. Therefore, itsprocessing projects around on the basis of the original sewage disposal, accompanied bygradually in construction process of environmental problems.This topic is to ZhongNingXian city reclaimed water treatment and reuseengineering as the research object,Inspection before and after its construction andproject impact on the environment during the construction.ZhongNingXian in ningxia hui autonomous region as one of the importantagricultural county, The state council is named "township of the Chinese wolfberry,"Not rich water resources. At present the industrial and urban residents living water arefrom the groundwater. In order to solve the shortage of water resources and water cityenvironmental degradation problems, ZhongNingXian sewage treatment plant inexisting sewage treatment plant for processing15000m3life sewage, and on the basisof the construction of the urban areas to water engineering, By the city life sewagetreatment plant drainage for further treatment, so as to achieve the recycled water waterquality index limits of reuse requirements. The recycled water project construction,During the operation period and to the environment pollution, whether pollution levelshow and reclaimed water production, use of this paper is to study the assurance ofpurpose. According to the technical guidelines for environmental impact assessment, Will the recycled water treatment process engineering analysis and the producingpollution’s link analysis, Regional environment of construction project is located thequality situation and main environmental problem analysis, Main environmentalprotection objectives, lists the list and protection level, According to the applicableevaluation standard,the construction and operation of the environmental consequencesof that period is analysed and some conclusions and puts forward some feasibleSuggestions. |