Font Size: a A A

Water Resources Construction And Development Planning Of Dongpo District In Meishan City

Posted on:2013-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:P TangFull Text:PDF
GTID:2249330395978554Subject:Use of agricultural resources
Abstract/Summary:PDF Full Text Request
Taking new rural construction planning in Meishan country as research object. To research present conditions of the water industry development and reform, development of economy and society of12th5-Year and water industry requirements, guideline, basic principle, overall thought and main targets of reform, the overall layout of new rural construction and water industry construction, principal tasks in development and management and reform of water industry, measured investment and analysis of result of plans implementation in Meishan country. Paper main research conclusion as follows:(1) The Water conservancy construction status of Dongpo district in Meishan country as follows:The flood control and disaster alleviation exist insufficient investment in engineering construction, Already built levee has weak flood prevention ability, emergency management ability shortage; at the end of the water resources in good condition, but exist regional distribution nonuniform. and inter-annual uneven distribution; farmland irrigation and water conservancy exist many unsafe reservoirs.many ditches fallen into very bad repair:investment for promotion soil and water conservation and ecological construction is insufficiency, ecological construction slow and don’t match with industrial development; water conservancy management sectors and water reforms lack of uniform management physique, engineering management unit lack of funds, the ability of tax’s service capability is too weak.(2) According to the request of12th5-Year economic and social development for water industry construction in Dongpo district, ensure purpose of12th5-Year water industry construction. makng a overall layout of water industry construction, Make main task of water conservancy construction:The flood control and disaster alleviation main task is prevent flood to reduce calamity, accelerate the development of flood-control works construction in Minjiang rivers and important tributary hard, focus on establishing and sound theprevent flood to reduce calamity’system in particular urbanization which along the river; the main task of people’s livelihood of the the water conservancy construction is assuring the safety of rural potable water, finish auxiliary projact of canal system of irrigation area and water-saving renovations, seepage prevention and reinforcement for unsafe reservoirs. increase efforts to develop capital constructions of irrigation and water conservancy, consolidating the infrastructure of water supplies which is drought resistant:the main task of water resources development and utilization is finish the irrigation area construction of large and middle scale reservoirs(emphasis water sources) and other utilization of water resources:the main task of save water resources protection is to achieve save and protect water resources through some means such as reconstructive engineering and newly built:the main task of soil and water conservation and ecological restoration of the lakes and rivers is finish the treatment of water and soil conservation, developing and constructing normative and orderly based on the principle of protect ecology; the main task of construction of water conservancy industry ability is consummating the construction of management of hydrology water resources and monitoring capability of water and soil conservation, informationization in water sector, infrastructure construction of emergency and management, infrastructure construction of science and technology of irrigation works, construction of administration and law enforcement capacity in irrigation works.(3) calculations on water conservancy construction planning investment of Dongpo district. Irrigation and water conservancy development planning and construction projects of12th5-Year, total investment to water conservancy construction3.81billion yuan, among them,continuous project is subject to invest1.202billion yuan;aiming project investment is2.608billion yuan. In addition, the planning of water conservancy construction reserve project in the region, total need to invest3.589billion yuan. All benefits will promote service capability in water industry obviously after the implementation of plan. Include:drought and flood control,waterlogged elimination and disaster reduction benefit remarkable, people’s livelihood water conservancy benefit remarkable, utilization of water resources benefit remarkable, save and protect water resources benefit remarkable, soil and water conservation and ecological restoration of the lakes and rivers benefit remarkable, the service capability of water conservancy industry obvious promotion.
Keywords/Search Tags:Water resources, Planning, Water conservancy construction
PDF Full Text Request
Related items