Font Size: a A A

Management Research Of Medicinal Aluminum Foil Packing Material Project Of Fenghua Company

Posted on:2013-09-08Degree:MasterType:Thesis
Country:ChinaCandidate:C M ZhuFull Text:PDF
GTID:2249330395468017Subject:Business administration
Abstract/Summary:PDF Full Text Request
China’s Aluminum foils packaging for medicine is developed in the1980s, so the contribution rate of this industry to the whole pharmaceutical industry is lower compared to the developed countries. It is account for pharmaceutical value of more than30%in the western developed countries, but it’s still less than10%in China. The industry is mainly concentrated in Guangdong, Jiangsu and Shanxi provinces at present. The difference in equipment between the domestic large-scale enterprises and foreign enterprises is not big but the gap in the industrial environment and the core technology is big, especially in the research and development of new materials. So the requirement to improve the new technology is urgent. China will focus on the development of Aluminum foils packaging for medicine in the coming period according to the planning, so this project provides an excellent opportunity. According to the Food machinery website report’the United States of Cleveland (July12,2011). According to the newest issuance report of Freedonia Group, Inc. whose general headquarters located in Cleveland of the United States that the expected global requirement of pharmaceutical packaging will present5.5%annual growth reaching62billion dollars by2015’.By general considerations and assessment of the organization of the project environment, risk management, cost estimation and resource analysis, by using the method of combining theory and practice and appraisal in this article to make reasonable arrangements to the progress of the project, to effectively use resources for the project, to ensure the project can be completed on schedule in project area, and benefit to reduce the cost of the project. Based on a series of methods and technology portfolio analysis of the work breakdown structure WDS, network diagrams and critical path PDM, the balance management optimization of resources in the project, we could develop the consisting project task as soon as possible and schedule the task sequence arrangement, use available resources effectively, especially use the key project resources and key resource sufficiently and effectively, so as to ensure the smooth implementation of the project and effectively reduce the cost of project management.This article made the main research results as follows:(1) the purpose of project management refers to the various knowledge, skills, tools and techniques should be fully used for projects in order to achieve the expected purpose of the project. In this study, through the research of system analysis argumentation on project initiation, planning, implementation, monitoring and closeout system we put forward scientific and reasonable construction method.(2) project construction goal is clear, consistent with national and Yunnan local industrial policy. The construction project will not only comply with the policy of the state ’s proposed national Twelfth Five-Year Plan and development compendium of policy, and very consistent with the Yunnan’s economic development strategy to have great significance.
Keywords/Search Tags:project breakdown structure, (WDS), critical path, (PDM)
PDF Full Text Request
Related items