Font Size: a A A

Study On Highway Construction Enterprise Maintenance Quota

Posted on:2013-01-22Degree:MasterType:Thesis
Country:ChinaCandidate:L X HuangFull Text:PDF
GTID:2249330392958964Subject:Road and Railway Engineering
Abstract/Summary:PDF Full Text Request
The Construction Enterprise Maintenance Quota is an important basis for theconstruction cost management and the tender offer,for enterprise, The ConstructionEnterprise Maintenance Quota not only the basis for enterprise program management,but alsoan effective tool for enterprise to organize and direct the construction. The ConstructionEnterprise Maintenance Quota provides a basis for the calculation of the labor remunerationof workers, effectively motivate workers,promote advanced technology.it can not be ignoredin cost management and economic accounting,and is the basis of the quota system of theconstruction projects.Based on the analysis of maintenance engineering and new construction’s differences andthe classification of maintenance engineering, determine the characteristics and functions ofthe Construction Enterprise Maintenance Quota.on this basis, and analysis of their impactfactors according to their characteristics; detailed investigation the Quota’s principles andbasis, and as a corporate conservation quote theoretical basis.After determine the Quota’s principles and basis, determine the labor, machinery’s fixedtime rang and material consumption’s rang according to the division of corporate conservationof fixed working hours. Detailed investigation the fixed time determination method, analyzeit’s advantages and disadvantages and limitations, provide a theoretical foundation for theConstruction Enterprise Maintenance Quota.Comprehensive survey of the fixed method,proposed the method of determination of thenumber of the small sample size, and the data processing of the gray relational grade of thebased on improved gray fuzzy theory; And analysis the shortcomings of the outliers removedmethod, Proposed using different outlier rejection method in different situations to ensuremore accurate and more realistic data that will remain, provide great help for the latepreparation of the Construction Enterprise Maintenance Quota. Determined the preparatorywork, existing project data collection, fixed breakdown,the steps of the Quota, the determineof Quota, the fixed level test as the steps of the Quota’s preparation.Combine with the classification of the Maintenance engineering and it’s work, and theactual situation of enterprise construction and Shanxi Province fixed budget breakdown of maintenance engineering, obtained the division of the fixed breakdown of ConstructionEnterprise Maintenance Quota.Combined with the actual construction situation, develop enterprise conservation quotasfixed determination table, actual determination of the fixed and take the modified masticasphalt road paver breakdown of the preparation for example to explain the fixed preparationsteps of the direct method, take petroleum asphalt the of the preparation for example toexplain the fixed preparation steps of computational model based on improved fuzzy theory.Finally, detailed investigate the composition of the jixietaiban cost, lay the heoreticalbasis for the Construction Enterprise Maintenance Quota, developed a corporate maintenancemachinery and fixed determination table according to its composition; detailed introductionthe mothod of the quota compasition,take CC232dualdrum compactor for example to explainthe establishment of machine quota.
Keywords/Search Tags:Construction Enterprise Maintenance Quota, fixed working hours, methodology, data removed fixed level
PDF Full Text Request
Related items