The Risk Manage Of Angola Society House Projiect In EPC Cntract

Posted on:2013-09-14Degree:MasterType:Thesis
Country:ChinaCandidate:X F CaiFull Text:PDF
GTID:2249330392952149Subject:Project management
Abstract/Summary:PDF Full Text Request
EPC is in English Engineering (engineering), Procurement (purchasing),Construction (Chair construction) abbreviation. EPC project General Contracting,design, procurement and construction (also known as the turnkey EPC), inaccordance with the general contractor contract, undertake engineering design,procurement, construction, commissioning service work and contracting project hasoverall responsibility for quality, safety, duration, cost.In recent years, as in the overseas market "going out" pace of accelerated,Chinese enterprises for overseas projects risk increasing emphasis on this aspect ofmore and more, also are gaining ground. But compared to the complex andfascinating overseas construction market, such research is far from enough, especiallyfor specific countries, specific market, specific projects carried out by "fine" ofsmaller. This article is for Angola kalanb.kayaxi social housing projects (followingare referred to as k.k project), to conduct a study on the risk, analyze, evaluate theirrisk, and for different risk management measures adopted, aimed at facilitating theirbid for the project company offers consulting and decision-making basis, andenterprises in other similar projects in the bidding and contractors provide reference.First of all, this article briefly describes the current domestic and internationalengineering project risk management research, systems discusses the project riskresearch risk identification, analysis and disposition of the basic method, and so on,and then describes the EPC contract model features, Angola and k.K project isdifferent from most of the overseas country projects, and on its characteristicsanalyzed, the significance of this project, the target and the basic idea. Papers thenexplains to k.k project-specific risk management study on how to do so., Includingon overseas project common risk, the risk factors of K.K project tables "and" projectrisk scoring table "OK, group of experts on risk assessment of the composition of theDivision of labor, personnel selection, the value of the right to determine,questionnaire and recall, according to the findings of the project risk analysis,evaluation processes and structures, to focus on risk management and control of, and so on. At the same time, also in combination with the practical effectiveness of riskmanagement is a summary and evaluation, improvement measures. The researchresults ultimately in the project’s tender and the contractor has a very important role,as the company provided a basis for decision-making, as the project’s successprovides assurance, risk management paradigm for extension. The author thinks, thisresearch methods, content and conclusions on Chinese enterprises to undertakeoverseas, especially Angola and other African countries of similar projects strongsignificance. At the same time hope that our enterprises to become familiar with anduse of risk management in the basic methods and tools, a more scientific analysis ofthe assessment and management of risks overseas projects, actively participating ininternational business competition.
Keywords/Search Tags:EPC, Angola, Project, Risk, Management
PDF Full Text Request
Related items