Font Size: a A A

Establishment And Analysis Of The Virtual Parts Pool For A Power Group

Posted on:2012-07-13Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2249330392451642Subject:Logistics Engineering
Abstract/Summary:PDF Full Text Request
With the deeply regulation of the energy sources, facing the high fuel costpressure, the power groups try their best to find a proper way to reduce the quantity ofof the spare parts in the stock, explore the enterprises’ third profit sources.A power group, which ownes three power plants, has a huge size stock. Thisarticle describes how to establish a virtual parts pool, discusses the inventoryconsistitution by the ABC Classification Method. I chose two sorts of the classicalspare parts; one was the hot path parts, which only has few kinds of spare parts, butoccupied almost half inventory. The other was that kind of fragile and consumableparts, which has a lot of kinds of spare parts, but only occupied few inventory.According to the characteristics between different parts, the article was dividedinto two parts. One part is for the hot path parts, comparing the traditional supplyscheme with the supply scheme by means of modern losgistic method, the laterscheme will help the enterprise to reduce the inventory effectively. The other partsdescribed how the VENDOR MANAGEMENT INVENTORY to help us to controland reduce the inventory.This article, just a sample, uses the modern, scientific management and logisticidea to control the inventory size, so as to find the enterprises’ third profit sources.
Keywords/Search Tags:power gourp, spare parts, virtual parts pool, ABC classificationmethod, borrow, rent
PDF Full Text Request
Related items