| Because of the complexity of the project, long-term and dynamic characteristics, anyengineering contract could not have foreseen and covered in the process of projectimplementation of all of the conditions of the contract of change. So for the construction projectis concerned, engineering change is inevitable.This article through to our country engineering change of the present research situationanalysis, according to the change of the party, change contains the specific content of theclassification of engineering change control respectively, induced current in under the mode ofvaluation of the characteristics of the engineering change and influential factors, and analyzedand classified, based on the change of the characteristic of the change process optimization.This paper mainly based on engineering change features, and raises the core part of thispaper, using the game bargaining model of engineering change control unit price. Bargainingmodel is to change the price of the parties through consultation of a strategy for bargain thisstrategy are analyzed in detail, and achieve the purpose of the game analysis, it also summarizesthe construction can better management engineering change method, which is beneficial to theproject owner of project investment control.The author mainly station project owner Angle to engineering change control, in order toimprove the treatment efficiency of engineering change, reduce the unreasonable change andrealize the smooth completion of the project, and to the total investment in the project control inthe books. |