To reduce cost and increase economic benefits is the enterprise production andoperation of the starting point and the foothold. Fracturing construction cost control ismanagement and fracturing construction project economic benefit evaluation ofcomprehensive index, the practical work should follow the fracturing construction projectcost control principle, from the lower the project cost, increase the income of two aspects,the construction project cost reasonable control, causes the enterprise to obtain the biggestbenefit. So in construction management how to increase revenue and reduce expenditure, tapthe latent power, how to complete the construction task for expected investment benefit, isthe current engineering technology service unit question, and solving these problems is themost effective way is to do a good job in cost and risk control. As a construction enterprise,in quality assurance, safe premise dissolve business risk and cost saving investment andmakes the project economic efficiency maximization, both enterprise pursuit of the goal, alsois the fundamental survival.This paper mainly introduces the research of cost control of the background, purposeand significance, the research train of thought and research content, and fracturingconstruction cost control and the status of the existing problems, focusing on fracturingconstruction cost control measures that should be adopted are discussed, mainly from theproportion of total cost is large materials, fuel cost, labor, repair cost, transport of thecontrollable cost and other various expenses happen process, the comprehensive control,especially for materials has carried on the key analysis, because the proportion of total costfrom39%in2007to60%in2011, accounting for the proportion of controlled variable costfrom64%in2007to78%in2011. First of all, combed the material management process,according to every detail of the process control, and strict appraisal system, make effectivecontrol measures, then to account for the proportion of materials in2011reached77%of thefracturing advocate material to carry on the analysis, from its constitute the main project fracturing fluid and support agent are studied, and the material to the materials to therecycling waste reuse to implement material visa system, using the system enhance theirsense of responsibility, increase the metrological supervision and personnel, strictly, accuratemeasurement, perfect standing book management, and design the control index andassessment rules, the rules for reward and punishmentï¼›In addition, the control also obligeresearchers use scientific method to study countermeasures, the introduction of intelligentliquor car, research fracturing fluid recovery unit, introduce the software tank, makeadvocate material plate, calibration densimeter, to the suction mouth and tap holetransformation, the fracturing fluid formula, and using temperature, etc., which could reducethe fracturing material the purpose of cost. Use of devices for major small leather, theproduct management and auxiliary material management play a positive role, such as theinstallation of oil tank alarm facilities, to auto parts to the old in the new, the old thing againfor repair and recycling, also greatly reduced the cost. Through the establish and improve“the key cost management regulationsâ€ï¼Œthe fracturing advocate material, auto parts,petroleum products, equipment repairs, the lubricating oil and so on the whole process of thespecific provision, clear responsibility, regular inspection and supervision, held regularly keymaterial management analysis, find and solve problems, and revise and perfect“the key costmanagement regulationsâ€ï¼Œuse the jam domicile finds all loopholes, have good cost controleffect. |