| The Qingdao Revo Factory was set up in the Huangdao District of Qingdao City by the Foton Revo heavy industry Co., Ltd. in 2005. and started to step in the excavator service. The company needs to start building the second phase with the expansion of business scale. Marketing Services Training Center is a two-building project carrying out in the first and is the only high-rise office building with the planned area of 12000 square meters and 12 floors. Its construction related whether the second phase can be smoothly carried out, and the second phase is the most critical link.As high-rise construction project, for the project time tight, invests, the much participation main body and many reasons, the project has the massive risk factor in the implementation process, and it may receive many kinds of risk factors frequently. this facts will give the project to complete difficulty, even causes the heavy losses, so it needs to carry on the strict risk management to it.This article carries on screening each kind of risk factor possibly produced to its construction, taking the office building of Huangdao factory of Fukuda Revo heavy industry as the backing, connecting risk management theory of the project, in view of the office building project's concrete background and it's characteristic. It clears about the risk factors of the key management, carries on qualitative and the quantitative analysis separately according to the relative risk management theory. And the project proposes corresponding risk guard and regulatory measures in view of the different rank's risk factor, and achieves guard against ahead of time which the possible bitter experience arrives to the engineering construction process, and can use the smallest cost to cause the risk loss which the project faces to reduce the threshold. |