Font Size: a A A

The Third Oil Extraction Plant Of Low Permeability Oilfield Construction Project Management Model

Posted on:2011-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:X Q FanFull Text:PDF
GTID:2219330368497569Subject:Project management
Abstract/Summary:PDF Full Text Request
China's oil production is currently facing can not meet the grim situation of domestic oil consumption, in order to solve this problem, study the development of low permeability oil fields is necessary. In the management of the domestic oil industry has been more use of project management, research for low permeability oilfield construction project management, to better meet the low permeability oilfield construction management needs, the implementation of the project and run more smoothly; conducive to low cost mining low permeability reservoir; security for the protection of national resources to safeguard national economic development and the maintenance of their own development are of great significance.Through the enterprise management theory and mastery of project management theory to explain the third Changqing oil production plant is now operating status and management status, and the third oil extraction plant of low permeability oilfield construction projects now in development status and development capabilities, that management in deficiencies. Management at home and abroad through comparison, the formation of the third oil extraction plant for low permeability oilfield construction project management ideas and frameworks. According to the resource characteristics of the third oil extraction plant and project management features, the author developed a third oil extraction plant project management objectives; on the third oil extraction plant structure, project management processes, project management, design of new content, making project management more scientific to ensure the smooth implementation of the project. Meanwhile, the establishment and operation of effective monitoring, evaluation system, control system and an effective incentive system so that the third oil extraction plant low permeability oilfield construction projects carried out in a reasonable mechanism to make management more effective.This paper aims to third low permeability oil field oil production plant construction project management research, allowing low permeability oilfield construction project management to play a more active role.
Keywords/Search Tags:Low Permeability, Project Management
PDF Full Text Request
Related items