Font Size: a A A

Design And Implementation Of The High-tech Project Management Of The TISCO Venture Capital Co., Ltd

Posted on:2013-01-30Degree:MasterType:Thesis
Country:ChinaCandidate:J D GuoFull Text:PDF
GTID:2219330362960963Subject:Project management
Abstract/Summary:PDF Full Text Request
2009, the state-owned venture capital industry can be described as mixed, the GEM to open an exit for venture investment has opened up a convenient way to transfer state-owned shares held at the same time the policy can also allow the state-owned venture crop failure. Faced with this situation, as a young state-owned venture, TISCO Venture Capital Co., Ltd. Hi-Tech to continue to bear the technology incubator businesses, respond to changes in the capital market to become the new situation after the venture of TISCO most important issue for future development.This article creates regarding Taiyuan Steel Works throws the high branch technology project management system, holds, undertaking board opening take the state-owned shares extension as the background, take project management's design as the core, creates on Taiyuan Steel Works throws the high technology and new technology project to propose the comparatively holonomic system's management plan. This article research mentality is: Proposed that Taiyuan Steel Works creates throws based on own development need, after 2009 state-owned creates throws the market the significant transformation, carries on the step according to the undertaking investment plan the goal decomposition, proposed a set suits Taiyuan Steel Works to create throws own state-owned system's project management pattern.In analyzes and proposed that in the plan process, this article creates under the state-owned system which to Taiyuan Steel Works throws to the undertaking investment risk high sensitivity to carry on the attention fully, and proposed in each link deals method. This article has mainly used the following several research technique: First proves Taiyuan Steel Works on the inside and outside factor impetus under to create throws regarding the innovation project management system's demand, afterward analyzes Taiyuan Steel Works using the SWOT analytic method to create comprehensively throws the high technology and new technology project investment the environment, then on project management's three key link - - appraisal, the later period manages, the withdrawal to design the corresponding module separately.In this paper, high-tech risk assessment is to examine the major aspects of business development prospects and the prospects for measuring the three indicators of enterprise development - Entrepreneur, product (technology), to ensure sustainable development of enterprises, has joined the company's legal assessment of risk ; investment follow the risk management component includes the value of enterprise risk training and its control, based on the value of the investment risk to ensure the security of investments; state-owned shares switched into high-tech venture capital policies on TISCO enormous impact on the project exit strategy, this paper Chapter VII of the proposed new situation for the VC's exit strategy TISCO.
Keywords/Search Tags:Project management, State‐owned shares switched out, Training, Assessment, Exit
PDF Full Text Request
Related items