Font Size: a A A

The Design And Implementation Of The Software Testing Management Platform Of Bank

Posted on:2013-02-23Degree:MasterType:Thesis
Country:ChinaCandidate:F ZhaoFull Text:PDF
GTID:2218330362958830Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In recent years, China Construction Bank Information Banking has made unprecedented progress in all kinds of business systems have on-line, but as the banks IT application project development work continued in-depth, project size and complexity are increasing, the project Improvement of software testing or software products has become a constraint to enhance the quality of the bottleneck.At present, China's most banks in the IT application testing project development mainly by the project team in the business staff. Most of these business people from the business post-deployed testing involved in the project, although the project has a wealth of business expertise and business experience, but for the test itself, its relative lack of skills and experience, a direct impact on the project quality. For this, along with the banking software testing work started, some Banks gradually established the professional software testing department, make software testing work into the system standard operation and management phase. Practical work in the test resource management, test process management, auxiliary testing tools, statistical analysis and evaluation of test data, automated test scripts and other aspects need to be a lot of manual operation, part of the test design and test execution requires a corresponding development and automated testing tool for testers a higher technical requirements. Brought to minimize manual workload, the test should be assisted to establish a unified management platform to facilitate the unified management and improve the quality of system test phase of the test.In this paper, the feasibility of banking software test management solutions for the standardization of test case management, test tools and procedures of the unified management, testing, monitoring and management process carried out in-depth study. For a complete standardization of test case design test case of the elements, combined with project information, version information, etc. to achieve effective standardization of test case preparation and implementation of standardized test cases; Test tools and procedures for the unified management, combined with the application of different software tools designed to test various elements of the test platform to achieve effective archiving and management tools to improve reuse rate; For testing process monitoring management, combined with the test case time elements, by formulating monitoring model in measurement and test execution situation analysis, reflect in the progress of the project the testing process. Through this program can be effective to test process management, improve the quality of test. This paper first analyzes the bank software testing are currently facing the management is not standard, puts forward the standard test case, unified test tools and implement testing process monitoring to perfect the bank management methods of testing; Then, the test case design, test tools each element, element analysis of the relationship between the meaning and the elements, and by establishing a monitoring model, the combination of effective test cases to test preparation process and factors of process test execution process monitoring; the focus of the testing process analysis, the overall architecture design, and various parts of the system design is described in detail; At last, Combined with the actual situation of the project use realized the software testing management platform of bank.
Keywords/Search Tags:Banking software, software testing, test management
PDF Full Text Request
Related items