Font Size: a A A

Tianjin Dongjiang Port Heating Technology Programs And Assessment

Posted on:2013-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y ChenFull Text:PDF
GTID:2212330374950548Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The Dongjiang port which is located in the North-East of the land area of tianjin port, was created the peninsular area by reclamation engineering in shallow beaches; The north and south sides longest port10.7km, thing wide3kilometers, the total area is30.9square kilometers, divided into10square miles east of xinjiang bonded harbor area and20square kilometers of comprehensive supporting service area two large area. According to the overall planning of xinjiang in tianjin port area, Dongjiang port will become east port complete supporting services and beautiful environment of modernization and internationalization, intelligent port.Heating planning is the northern port construction must be considered.It is the basic function, and it is the normal operation of the basic guarantee for cities. To draw up a scientific and reasonable plan of the heating construction and development have the important meaning for improving the ability to meet people's, heating security life demand, the atmospheric environment,and constructing the harmonious society.This paper combined with the overall development plan of Tianjin Port, Dongjiang Port and Tianjin "12" heating development plan, based on national energy-saving regulations and standards, as well as domestic and foreign advanced heating and cooling technology for Tianjin Port heating and air conditioningthe solutions proposed to optimize the operation strategy, future development of port construction heating refrigeration and air conditioning system, energy-saving design, to reduce energy costs to ensure the safe operation of the target. According to the actual conditions of the availability and decision making when considering the different focus, given the actual situations of the optimization and suitable heating mode, and further integration of the whole region of the energy supply structure, the adjustment and optimization of the regional district heating system.By heating the appraisal index system of the actual situation, in view of the different optimal, suitable heating mode become the cause of heating is particularly important, it has important practical significance. Heating way selection and evaluation research is an extremely broad range, need a large number of investigation and test data of the soft task, at the time of the study need comprehensive consideration of each heating characteristic, undertake concrete analysis and calculation, the design is reasonable and effective evaluation index system, combined with a variety of possible situation, decision making target preference, to eventually give satisfactory results, to guide the implementation of construction projects. This scheme for the planning and supervision combined, so that the heating facilities in accordance with the planning and orderly, and implementation of the project on environmental impact and heat supply security assessment, finally the project financial evaluation of project analysis, the overall level of risk is smaller, with investment value.
Keywords/Search Tags:Dongjiang Port, Heating, Demand and supply, Advanced nature, Suitability
PDF Full Text Request
Related items