Performance Appraisal And Cost Management In Construction Of Nanjing Overpass Highway

Posted on:2016-03-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y YuFull Text:PDF
GTID:2209330503976419Subject:Control Engineering
Abstract/Summary:PDF Full Text Request
"Construction Agent" is a new project management model, it is different highlighted in previous "investment, construction, management, use the" four integrated management model.The advantage is "voted to build the separation, restrict each other." Not only can more effectively control investment, quality and progress against corruption, but also to save social resources, and ensure maximum return on investment, in line with the direction of China’s investment system reform.From a practical look around, agent system is feasible, effective, and achieved significant social benefits.Although already a fact, but other new things, there are some deficiencies which need to be carefully studied and improved.Practice of implementation of the System Mode from the point of view of transport infrastructure projects, at present, there are two major prominent problems:First is construction costs of the standard fee to be improved.The second is less Agent-construction company Evaluation of Performance.From the Agent System definition, an analysis of the research results to the case analysis of existing projects on behalf of the construction management fee calculated on the basis of funds and other payment methods and reward profiles agreed to take charge, pointing out that due to the current generation of construction management fees presented covering the more obscure, low cost and no limit on behalf of construction and Agent-construction assume risks, liability and other characteristics, the impact of the project on behalf of the healthy development of the construction market.This paper studies the relationship between cost and performance level on behalf of the construction to proceed, discusses the establishment of KPI system, KPI performance appraisal method and its applications and to performance appraisal results for parameter generation building management fee of two models:the whole process on behalf of the construction cost model, on behalf of the construction costs of the building model.To further demonstrate practical significance to promote the two models,In this paper, the major transport infrastructure projects in Nanjing, the first successful use of System Mode Management Construction-A Case Study of Nanjing raoyue expressway.Analysis of the indicators used in projects raoyue empowerment of AHP and comprehensive evaluation of the efficacy coefficient method two performance appraisal methods, and the calculation method of generation and generation cost model built around project construction costs taken. Proved generation model was built to take charge fees KPI as a parameter in the generation of construction project management is feasible and effective.
Keywords/Search Tags:Construction Agent, Performance appraisal, Agent construction costs, KPI, AHP, Efficacy coefficient method
PDF Full Text Request
Related items