Font Size: a A A

Needs Of The Project Management System - The Design And Realization Of The Problems And Needs Of The Forum Module

Posted on:2011-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y S H OuFull Text:PDF
GTID:2208360308480998Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With today's software industry development, software development has become increasingly mature. Demand analysis in the entire software development process is the importance of increasing significantly. How accurate and timely access to the needs,demands and the right to conduct real-time tracking has become the focus of people's attention. Software project requirement and problem of development management system will be able to demand and the management of change from manual to automatic, greatly increasing the demand for management efficiency and effectiveness. Based on the above considerations and the development of a set of demand management software -- PRM system.Implementation of the system of the B/S structure, MVC application framework and the introduction of the Struts Framework and Hibernate combination of a lasting solution case. Implementation of feedback and demand, the project needs to change and demand the realization of the automatic tracking. Project Development of feedback and tracking single building. The project experience has been summarized and online sharing, software development projects to explore the online functions.In this paper, the current demand for software project management system with the problem of the status actuality, Analysis of J2EE related technologies. In light of the actual needs of the software development and change tracking process needs to PRM system for needs analysis and feasibility Analysis. To the problems and requirement of the exchange zone module of outline design of PRM system (including system architecture, package design and module design) and the detailed design (including the design and function module database tables and their relationships design). Finally from the public part of the system to achieve, with the demand for the exchange zone modules and the realization of the application of key technologies and difficult to resolve some aspects of the system to achieve the elaborate out.
Keywords/Search Tags:PRM system, B/S structure, MVC model, Struts framework, Hibernate
PDF Full Text Request
Related items