Font Size: a A A

With Shanghai As The Hub Of The Yangtze River Basin Container Multimodal Transport Edi Information System Planning,

Posted on:2004-06-08Degree:MasterType:Thesis
Country:ChinaCandidate:G S WangFull Text:PDF
GTID:2206360125961304Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
Yangtze River, ranking first in our country rivers, plays a great important role in the development of the national economy. As the development of the area near the two sides of Yangtze River, the transportation network becomes more and more perfect, and the amount of transportation increases year by year. Recently, the container multi-modal transports in Yangtze River Area have increased greatly, too.However, the container multi-modal transports in Yangtze River Area are on the start now, and a lot of problems are to be solved. In general, these problems contained the followings: the management systenru policy and laws and transport network etc, among which the difficulties of information transfer and documents communication are very vital. The Yangtze River Container Multi-modal Transport EDI Communication System Projects came into being for the problem. This paper focuses on the projects, and this is also the reason of the research.The contents of this paper are listed as following:Chapter 1: The paper discussed the meaning of the paper title, the history of the EDI communication system construction, and in this part we also illustrated the study method and the content of the paper.Chapter 2: We analyzed the need and the feasibility of the project. We can see that the project is both necessary and feasibleChapter 3: We put forward the basic frame of the project, including the instruction and the objecU the content and the frame.Chapter 4: We analyze the multi-modal transport axis center platform of Shanghai, including the system framework of the platform, network structure, the equipment choices of the center and the estimate of the fund etc.Chapter 5: We analyze the IT technology platform construction ofShanghai, including the general objective, system structure, the schedules and the estimate of the fund etc.Chapter 6: The paper discussed the procedure of the project to put into practice, the suggestions and the application method etc.
Keywords/Search Tags:multi-modal transport, EDI, axis center, IT technology
PDF Full Text Request
Related items