Font Size: a A A

L Power Plant Construction Projects Feasibility Study

Posted on:2008-08-10Degree:MasterType:Thesis
Country:ChinaCandidate:X L ZhangFull Text:PDF
GTID:2199360215955703Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Following with the great developing of western region, economic development in Guangxi province increases quickly, the homologous electric power need growth also expands quickly.It is reported that the whole Guangxi province electricity use will account to 50000 GW.H in 2010, increasing 55% compared with 2005. Because of the aluminum mineral industry has been extended and other big business enterprises have increased electricity use, Guangxi electric power need will increase bigger during"15"periods.For meeting the need of electric burden developing, programming constructing the L power station is very necessary.If we don't constuct power station of L and other fire electricity plant, the charged barbed wire net of Guangxi will lack electricity seriously, it will appear Guangxi and Guangdong both buy the west electricity.It will directly affect the realization of Guangdong sending electricity strategic target.For resolving Guangxi "15" periods electric shock problem ,constucting L power station is very necessary.This text will set out from the details of each part,combining current local science and technology level, policy norm, Guangxi actual natural environment and condition, pass to collect a great deal of data, have many angles to carry on the thorough research and argument to discuss initial possibility of this item.The contents of the main research have: the electric power system present condition of Guangxi,the necessity of contrucing the L power station, the fuel supply and transportment, the L power station construction sites choice, the eight greatest systems solution and smoke takeing off the sulphur, environmental protection, water and soil conservation and invests to estimate the economic performance analysis etc. With the textual expressing, I will provide investment importance of the strategic development for shareholders investing power station along sealine and related professionals, also provided the skill data for the possibility that other industries invest.This text concludes that the constructing of L power station has the possibility.Considering from market oriented economy, if we don't constuct the power station of L, the charged barbed wire net of Guangxi will lack electricity seriously.It will appear Guangxi and Guangdong both buy the west electricity tightly.It will affect the realization of the west electricity east sending strategic target directly. For resolving Guangxi "15" periods electric shock problem ,constucting L power station is very necessary.Considering from the national charged barbed wire net developing program ,currently, the water gives the specific weight in the charged barbed wire net power supply of Guangxi, such as have no homologous fire electricity construction, the path galvanism station for lord of water giving specific weight will further enlarge, making the charged barbed wire net movement difficult.Moreover, the main power supply distributes in western region of Guangxi, there is no big power supply in southeast region to order, the credibility of electric power long-distance transporting is not easy.Therefore, the constructing L power station will improves power supply layout and structures , it will adjust the ability of busy time, it will take the important function.Considering from the L power station sites choices and possibility of each system constructing, the condition of this engineering factory setting up factory is ideal, the factory site condition is good for engineering constructing, the factory site engineering geology condition and stability are excellent, it is not easy to occurr geologic disaster.The L power station recommend that Datong tower mountain coal is reasonable.Combining the actual circumstance of the L power station factory site and local technique level, the construction of each system has the possibility.Considering from investment and the economic analysis, this item engineering static state unit accounts to 4155 RMB/kw, the investment is reasonable, the electricity price has goof competetion, the economic performance is more good of, it has certain anti- risk ability.Consider from environmental protection, this item constructs the engineering synchronous smoke taking off the sulphur facilities, taking off sulphur efficiency≥90%.Adopting the static electricity dustoff machine sweeps dust efficiency≥99.82%. Adopting the limestone- gypsum wet method smoke taking-off can raise the smoke and dust to take off.After each kind of dirty water handling or reaching the standard, we can reuse them or exhaust again, the quantity pollutant exhausting is very small,It is the engineering of the environmental protection performance detergently.
Keywords/Search Tags:Power station, Construction, Possibility
PDF Full Text Request
Related items