Font Size: a A A

The Mode Selection Of Public Project Financing And Risk Control

Posted on:2012-01-12Degree:MasterType:Thesis
Country:ChinaCandidate:W LiFull Text:PDF
GTID:2199330335491202Subject:Project management project
Abstract/Summary:PDF Full Text Request
This paper introduces the relevant background of domestic and foreign financing of public infrastructure construction projects,and analyzed and summarized the development process of public project financing and related theories.When facing a variety of features and complexity of the different financing models, the investors of public projects need to make a rational choice of the main, to develop the right strategy for financing model, with its own conditions and characteristics, according tocertain criteria, and based on considering various factors. At the same time, financiers also need to control and manage risk.The paper discusses a variety of different modes of public project financing and its current application, by using comparative analysis. The author also analyzes the comprehensive study of public project financing model selection strategy and risk control.On this basis, author selected the Hengdong sewage treatment plant in Hunan Province as a case, and used qualitative analysis and expert scoring method to study and analyz several models of the project financing, to get the optimal financing model-BOT model finally.The paper has important practical significance for expanding public project financing channels in China, rational useing of project finance model, effective useing of domestic and foreign capital for China's modernization process.
Keywords/Search Tags:Public Project Finance, Finance Model, Choosing Strategy, Risk Control
PDF Full Text Request
Related items