Font Size: a A A

Building Structural Deformation Monitoring Of Auxiliary Systems Development And Research

Posted on:2004-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:H B LiuFull Text:PDF
GTID:2192360095950037Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
The text describes the exploitation of deformation monitor subsystem of architectural engineering. The whole system construction undergo a series of segment such as system planning system design software development data base design .It is a process that growing out of nothing, from simple to intricacy, from confusion to tangible, from handiwork dispose to computer processing. Intricacy tangible it was one de novo, conform to the principle of simplicity odd to intricacy, from confusion till materiality, from handiwork dispose till get to figure course up done that overall system construct experience know clearly system planning, system design, software development, data base design equivalence class segment.1.SummarizationDeformation monitor of Building structure is a job which uses measuring apparatus or special instrument to measure the deformation of building (structure) at the action of load or outside force with time. Since early , human being fund extensive experience at the aspect of the secure monitor of high huge buildings and badness geology (the accuracy prediction of landslide of ChangjiangSanxia in!985,which saved the 11000 lives ),exposed profundity lesson at the same time(the large landslide of Vajaut arch dam caused the death of 3000 in Italy in 1963 . The accumulation of long-term experiences and lessons cause people take recognize the importance of the secure monitor of high > huge buildings and badness geology ,therefore .international surveyor association (FIG) establish deformation monitor and automation committee and distortion measure analyses committee to engage the research of deformation monitor and data processing.In company with the development of social economy, the national construction industry developed swiftly and violently. The buildings of High large special new have sprang up. As is well know, building can yield different kinds of distortion from beginning of construction due to natural and man-made factor, therefore, it is important to know the status of deformation, analyze the cause of deformation, predict future deformation for accident prevention, regular service of buildings .In order not to impact constructional regular service and guarantee the safety of construction, the building's deformation monitor must be carried out before constructing engineering structure at the course of construction as well as at the course of in service. Building structure deformation monitor is a kind of dynamic monitor in the course of full longevity of building, therefore , the data are very large. How to supervise and utilize the enormous data concerns the realization and the quality of monitoring deformation and predicting deformation and it is not satisfied with the required of design and construction far from if the process of handling these data is only in the handiwork phase . We can utilize themerit of processing data of computer to dispose data precisely and in time and search out information we required. Therefore, we must exploit a sort of MIS of deformation monitor in order to exercise information monitor and supervise construction and revise design and ensure engineering secure. In company with the thorough recognition of deformation monitor's importance and enforcement of concerned regulation, building structure's deformation monitor has more and more been extensive used in engineering and it is important to exploit a sort of MIS of building structure's deformation monitor.2. Object managementMIS is a category of project and can we can use the idea and means of project management to coach its construction and endure the success of exploitation. In the course of the system exploitation, we carry out target analysis firstly, involved in quality objective and tempi object, estimate the sizing of the systems, establish scheduled plan and use different ways to trace and control in the course of project implementation. The construction of MIS is to complete definite missions and these missions must reach to definite quality requirement. Therefore, quality control...
Keywords/Search Tags:architectural engineering, distortion monitor, project management, quality fuzzy appraise
PDF Full Text Request
Related items