The Optimization Design Of Jilin Mobile Communication Corporation NGBOSS Project Management Process

Posted on:2010-05-12Degree:MasterType:Thesis
Country:ChinaCandidate:D P ZhangFull Text:PDF
GTID:2189360302466172Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In January 2009, the country has carried on the 3G license plate provide, symbolizes that China enters the 3G time officially, after 3G network completes, each kind of new service unceasingly will promote, also had the new request of the bill and the service, for supply a better support to 3G, realizes a precise bill and the high-quality service of the 3G service, must establish one stably, precise, safe, the highly effective BOSS system (Business operation support system), also the NGBOSS system. So, How to design the project process, guaranteed that this project completes the project construction smoothly and achieved the project goal becomes very important.This paper first introduce the related knowledge and the development process of mobile communication technology and the BOSS system in the first chapter, explained the BOSS system needed to develop along with the mobile communication technology development, elaborated the related background of A Jilin Mobile Communication Corporation NGBOSS Project construction, then analysis the NGBOSS project construction's necessity and feasibility, and determine the NGBOSS project construction was necessary and feasible.In the second chapter, study the NGBOSS project from three aspects :the cost control, the scheduled plan and the quality improvement, determine the project construction goal and the request. And in the cost control aspect is mainly according to the cost control elementary theory and the request, had determined the project overall cost as well as involves the specific items cost, and gave an example to elaborate the related method and the mentality; in the Scheduled Plan aspect, according to the project schedule management's request and the project's actual situation, work out the detailed project progress schedule; in quality improvement aspect, according to quality improvement correlation theories method, improve NGBOSS project's main three aspects: The project itself, the project implementation process and the management process , and elaborated the concrete improvement program.In the third chapter, design the NGBOSS project's implementation stage. Make an optimization design mainly of the overall flow plan, the design organization system, project implementation stage. In the overall flow project design, according to the project management request, the union project characteristic, utilizes the PDCA circulation method, formulated a overall process which divided into four main stages; In the design organization system aspect, elaborated each unit's responsibility which the project implementation process possibly involves; in the implementation stage, first determines the implementation content, then determine the implementation plan according to the basis implementation content, and has carried on the detailed elaboration of the implementation plan.In the fourth chapter, elaborated the question and the solution which the NGBOSS project construction process possibly faces, such as the lack of the independent testing environment , the lack the test method and the tool, the system hardware and the software match question, the question of the coordinate between official prescription and the manufacturer personnel, the question of the coordinate between technical personnel and the administrative personnel, the communication coordinated cycle question, and proposed concrete solution of each question. For example , inviting test company using testing tool, establishing the test example, using the disaster system can solve the lack of the independent testing environment; Using the PDCA circulation method, using the new and old system parallel detection can solve the system hardware and the software match question; Establishing project manager responsibility system, determining the unified data dictionary, establishing the regular communication system can solve the system operation personnel coordinated problem.The Jilin Mobile Communication Corporation NGBOSS Project is now on progress, through implementation stage's actual result, the optimized project process has made a very good progress, and achieved the anticipated goal. Through the study of the Jilin Mobile Communication Corporation NGBOSS Project, the purpose is to seek one possibility, which in the complex project engineering construction, how to achieve the possibility by making the project process's optimization design to guarantee project construction goal realizes smoothly. This gained the experience for the following other project construction's smooth implementation, and develop the mentality.
Keywords/Search Tags:Jilin Mobile Communication Corporation, Cost Control, Scheduled Plan, Quality Improvement
PDF Full Text Request
Related items