Font Size: a A A

Engineering Insurance And The Construction Project Put Scheduled Time Risk Administration Into Practice

Posted on:2010-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:W H CengFull Text:PDF
GTID:2189360278959370Subject:Business Administration
Abstract/Summary:PDF Full Text Request
At present, the basic construction of our country at the peak of construction projects from planning, design, construction to completion, there are many risks, from a risk management point of view, the project risks with strong specificity. First of all, building and construction projects are highly technical in nature, specificity and complexity of the many units involved, a long construction period. Secondly, the amount of investment in the project at every turn tens of millions, hundreds of millions, billions or even hundreds of billion yuan, a huge investment in the event of these risks are borne by investors, it is difficult, but also will affect the entire society.This article works at home and abroad insurance system were compared on the development of domestic insurance and the importance of the way. On the project with the special nature of the risk of a brief introduction, an analysis of the project to strengthen risk management of the importance and urgency. With a view to project managers to recognize that the success of a project, risk management will play a very important role.In this paper, through analysis of the actual case on the construction (installation) project all the risks inherent meaning of the research project through the insurance risk management, insurance cover, in the construction phase and determine how to prevent losses, such as how to claim the practical question.In view of the project construction practice, the project owner or contractor on the project insurance provisions of the insurance industry as a whole, as well as the operation of the system, a lack of awareness, low awareness of risk prevention, the use of good works projects Risk Management insurance, construction paper Implementation of the project period of risk management through case studies and methods are described and summarized in order to play a forward role, hopes for a better use of insurance works projects Risk Management to do a good job of providing peers in the industry learn from and work together to improve China's management of construction enterprises The level and improve international competitiveness.
Keywords/Search Tags:Engineering Insurance, Construction Project, Put scheduled time into practice, Risk Administraton
PDF Full Text Request
Related items