With the copper market demands are constantly changing, copper processing enterprises in order to quickly seize the market, develop products with the flexibility, Actively engaged in equipment modification, updating of existing production equipment, Metallurgical Equipments R&D projects has broad market prospects. How to make the smooth conduct of R & D projects to reduce the chance of project failure, to avoid unnecessary losses, is an urgent need to be addressed of the metallurgical equipment manufacturing enterprises.Basing on Metallurgical Equipments Electrical Control System R&D and relying on some risk theories, this thesis has described Metallurgical Equipments Electrical Control System R&D risk. In this paper Electrical Control System of Copper Strip Horizontal Continuous Casting Line Project as an example, made a description on the characteristics and surroundings, Systematic analysis of the Electrical Control System of Copper Strip Horizontal Continuous Casting Line Project of various risks. It has set up a valid risk decision making mode for Electrical Control System Product development by measuring each risk. It has made a risk decision of Electrical Control System of Copper Strip Horizontal Continuous Casting Line Project. it has also Proposed basic risk guarding against requirements of Electrical Control System R&D and detailed risk guarding against measures to Electrical Control System of Copper Strip Horizontal Continuous Casting Line Project.The thesis has Pointed out that method of risk analysis, risk measuring, risk guarding against and risk decision making to Electrical Control System of Copper Strip Horizontal Continuous Casting Line Project not only fits for Metallurgical Equipments R&D, but also fits for general Machinery Electrical Control System R&D Project and could be widely applied... |