Project Cost Control Research Of Cost Consultation Unit In Design Stage

Posted on:2009-12-06Degree:MasterType:Thesis
Country:ChinaCandidate:C L YuanFull Text:PDF
GTID:2189360272973641Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The design phase occupies the least time in the life cycle of a project and the least funds, but just the least time and the shortest investment in design phase, it plays a key role in the cost controlling of the whole project, it reaches 75% to the entire project construction cost influence. However, at present, there are many loopholes in project construction cost control in the design stage in our country making project cost control in design stage design first and calculates the account second, the total construction cost is equal to various aspects construction cost the arithmetic sum and lack of a system design concept stage of the project cost control and control modes. It has hindered our country construction cost management level development and has weakened and the international construction cost management profession competition strength. Therefore, how to optimize the design phase of cost control, how carries on the reform and reforming to the design stage construction cost management and how establishes the feasible design stage construction cost control system is a problem worthy studying.In this paper, In view of this phenomenon, Analyzes the domestic and foreign construction costs control present situation, understanding along with joins WTO the challenge and the opportunity which brings to our country design stage construction cost control, Redetermines the design stage construction cost control the main body-construction cost consultation unit. The article stands in the construction cost consultation unit's altitude, embarks from the design stage entire process construction cost control angle and the omni-directional construction cost control, After first will divide gathers, divide the design stage construction cost control into several levels, cost control in project definition phase, analysis preliminary design stage and construction drawing design stage construction. Analyzes the existing design stage the construction cost control method and the theory, and designed a control method for construction cost consultation unit in this foundation to carry on the entire process construction cost control to the design stage. Including design stage construction cost control main body transformation, The design stage construction cost control plan formulation and to its concept construction cost forecast carries on the detailed method proof. Moreover, determinate expense undertakes and the benefit assignment, and suggesting takes the reasonable encouragement measures in order to make the design stage the construction cost control toobtain the most greatly possible realization. The entire control method design all is from the construction cost consultation unit's angle consideration, unifies actual also the establishment in the massive facts foundation, has the reality very much the feasibility. It will be able greatly to enhance the construction cost consultation unit to carry on the construction cost control in the design stage the working efficiency and is advantageous to the operability of carrying out construction cost control work...
Keywords/Search Tags:design stage, construction cost consultation unit, cost control, limits design
PDF Full Text Request
Related items