Font Size: a A A

The Study On Project Practice Quality Control Of Peng Source 66Kilovolt Transformer Substation In Shen Yang

Posted on:2010-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:J S LiuFull Text:PDF
GTID:2189360272499302Subject:Project management
Abstract/Summary:PDF Full Text Request
Getting benefit from the management has become the entrepreneurs'mutual recognition. Doing well in the engineering project management is the most important way to get most economic efficiency. Engineering project management is process which would plan, manage and control the project. It's a very complex project and is a sub-system in the modern business management system. As an new management pattern, project management fits the socialist market economy very much, and enterprise optimized disposition of the element of the production.Peng Source 66 Kilovolt Transformer Substation is a new project which is built because of the construction of the Heng Long Mall. Peng Source 66 Kilovolt Transformer Substation would alleviate the tense power aspect in Zhong Street And supply good life condition for people, and will cause the electrical network layout to be more reasonable. There will be very important affect on electrical network of Shen Yang. Peng Source 66 Kilovolt Transformer Substation is manifest of keeping the economy to grow and drawing needs of our country.Peng Source 66 Kilovolt Transformer Substation would build in winter depend on the need. However, there are many difficult between the project. For example, weather, technology, quality and so on. Through the research the control of the quality of Peng Source 66 Kilovolt Transformer Substation, the way and suggestions will help us to improve the quality of the project. And every step would carry on smoothly. The quality control of the project will be done from organizing the people, preparing the spot for the project, documents, equipment, infrastructure, material and technology to the control of the project and analyzing the quality control after the practice of the project. We must do it according to the program, and adjust the problems in time. Although Peng Source 66 Kilovolt Transformer Substation used little time to complete the project, we successfully do our job because of the good job of the builder and manager. The project get good appraise from the leader and company. I use the literature methodology, the investigation methodology, the contrast analytic method and the system-science method to research the quality control problem. Firstly, I introduce the theory which would use in this article, and analyze the background,significance and methods of the research.Secondly, I introduced the construction factor of the transformer substation in winter, including the weather factor, human factor, method factor, material factor and so on. Thirdly, I analyze the plan of the practice of the transformer substation project including the rules, methods, plan of the practice of the project, plan of using the material and the method in keeping the quality of the project. Forth, I research the methods in controlling the quality of before the project, between the project and after the project. And I analyze the effect of the quality of the project. At last I draw a conclusion .There is little research in the project transformer substation in winter before. Because of the need of the article, I spend much time and energy on this problem. Through investigation I collect many materials to write this article. I investigated the problems which appear in the project construction process and the effect of the project construction. Through investigation I give my suggestion on the problem, and there will be good value in the practice of the transformer substation project.To do well in the electric power project has certain social efficiency. It's respond of the policy of keeping economy to grow and pull needs of our country. Going hand in hand with the development of the technology of the science, the level of the technology of the project practice has improved immediately. Through the hard working of us, there will be more development in the technology of the transformer substation project in winter of our country.
Keywords/Search Tags:Electric Transformer Substation, Project in Winter, the Quality of the Project, Quality Control
PDF Full Text Request
Related items