Post Evaluations Of Yanji Centralized Heating Project

Posted on:2010-09-07Degree:MasterType:Thesis
Country:ChinaCandidate:J YuFull Text:PDF
GTID:2189360272499078Subject:Project management
Abstract/Summary:
In recent years,China's northern region,the rapid development of central heating projects,and the feasibility of such projects,construction methods,production operations,the financial evaluation of the research carried out less,therefore,the use of project management related to professional knowledge,Jilin Yanji City,Province, central heating projects from the post-evaluation study to determine the project objectives are expected to achieve,the main indicator of whether or not realize the economic benefits;compared fairly and objectively determine the project decision-makers,managers and builders work performance and problems,thus further enhance the level of responsibility and work;for enterprise management of "diagnosis" to promote the normalization of the operation of the project status.At the same time through the project the project decision-making,project construction, production operations,financial benefits,etc.to evaluate similar projects for the construction units to provide a basis for decision-making.1,the project evaluation decision-making stageThe project preparatory work for the implementation of national and municipal infrastructure construction bureau of the rules and regulations,in accordance with the procedures for the operation of the capital,in line with the provisions of the decision-making process.2,preparatory work for phase evaluationThe project preparatory work conscientiously in accordance with the procedures for the operation of capital,decision-making process in order.The availability of resources required for the project have assured that the full market analysis, positioning accuracy,choice of an appropriate scale,using advanced and reliable technology,equipment selection and reasonable match.In strict accordance with the approved preliminary design documents and requirements of work,based on full, good quality.Processes,equipment selection more reasonable to meet production needs.System to meet the needs of device production,the main design specifications and feasibility report of good agreement.Through the feasibility study report and preliminary design of comparison,the raw materials,load forecast and the scale of construction in the feasibility study report can control.3,construction stage evaluationProject construction process of the full implementation of project management, strict implementation of the capital process to ensure the scientific management, civilized construction,from the schedule control,quality control,investment control, the expected completion of all aspects of mission building.After trial operation period of the examination and the three of heating the overall operation proved that the project design to meet the needs of the production run,the project quality,the main operating conditions and economic indicators meet the design requirements.Items from the construction design,equipment and materials procurement,bidding for the project construction,construction supervision,commissioning,completion of all stages of production strictly in accordance with national,industry standards,the implementation of the requirement.4,production evaluationProject since the beginning of the production of trial operation,the boiler and heating network running smoothly,the economic and technical indicators have reached the feasibility study and preliminary design level,running through several years of practice,in the production run command,saving energy,deal with unexpected events,such as the gradual accumulation of operating experience,in ensuring the smooth operation of system security,based on unit energy consumption declining year after year.Work in basic management,the development of the operator job responsibilities,work standards,rules and regulations to run a point of order,etc. At the same time,increased staff training,and effective in improving the quality of personnel to ensure accurate operation of norms.Run command in the production continuing to simplify command procedures,the development of the system start and stop operation,the system regulating a series of command regulations,effectively improve the work efficiency.In saving energy and reducing consumption,the combination of pumps and plate heat exchanger characteristics and the actual operation,and explore the day-conditioning load,heat exchanger and the flow of matching the actual operating experience,effectively reduces the energy consumption. Deal with unexpected events in context,for each system operating in emergency situations,has targeted the development of the corresponding contingency plan and organize the corresponding exercises,and constantly improve and effectively guaranteed after the accident,the system time to restore.5,cost-effectiveness evaluationThe project through post-production evaluation of actual profitability analysis, the project's electricity prices,coal prices were higher than the feasibility report of the value of cost increase from 2005 to 2008 the average annual research report in the target,but in 2009 its cost is higher than the rate of increase of revenue increased heating prices have risen after the market pricing.The project main factors have increased profits by higher prices of products and services,main factors have reduced benefit costs rise too much.6,impact assessment and sustainableCentral heating in Yanji City limited liability company,is the main heating of the heating to civilian enterprises.Completion of the project,so that heating in Yanji City has a greater ability to improve and enhance enterprise competitiveness and social development potential.And a sharp drop in heating costs,and a large number of dispersed small boiler room of the ban,the city improve the quality of life and environmental quality of urban construction and environmental protection has played a very active role.Supply of raw materials from the project,the technology level, equipment status,ability to adapt to the market in terms of central heating in Yanji City projects can be long-term security and stability of operation.Through the project construction and operation of the various stages of evaluation and analysis,the project in line with the building process,the project construction process the construction unit formed a project team and project manager leading the Department to develop and implement an investment,progress,quality, safety control measures to achieve the project supervision system,the timely completion of construction tasks,construction quality.The project put into operation the fuel cost savings achieved,the goal of reducing heating costs.The project design reasonable,material procurement bidding Strict use of modalities,financing in place on time,investment and control the use of discipline to achieve the quality of the project 100 percent pass rate.
Keywords/Search Tags:Evaluations
Related items