The Research And Case Study Of Engineering Project Risk Management

Posted on:2009-01-16Degree:MasterType:Thesis
Country:ChinaCandidate:J YanFull Text:PDF
GTID:2189360242483680Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Because the engineering project invests is huge, the time limit for a project in a big way is long, the unpredictable factor quite are also many in the construction process, such engineering project throws the capital inevitable ground to be near each kind of risk, therefore, throws the capital to have to strengthen the investment risk management, completes the risk the recognition and the guard, which guaranteed the construction project construction carries on smoothly. This article applies the domestic and foreign risk management fundamental research achievement, elaborated our country construction project investment risk management from the engineering project investor's angle. Proposed carries on the recognition, the appraisal, the analysis method as well as to the risk to the construction project investment risk should to the measure. And take the theory as the instruction, has conducted the analysis research to the concrete construction project investment risk management.The article include six chapters as follow:Chapter one, basic theories summary of investment risk management. It is basic theoretical foundation of the article. The article defines the relevant concepts, including the concept of the risk and concept of investment at first. The article has introduced formulation and development of the theory of the investment risk management and has pointed out intension and content of risk management on this basis, the article have explained the important meaning of risk management.Chapter two, the article is discernment about the investment risk of construction project. summary the discernment about the investment risk of project firstly, then probed into the method of discernment about the investment risk of construction project and then analyzed investment characteristic and risk characteristic of construction project. On this basis the article carried on the discernment about the investment risk of construction project from two angles of investment risk type and phased risk.Chapter three, is analysis and assessment about the investment risk of construction project. The article has carried on analysis and assessment about the investment risk of construction project at first and then have explain the theoretical foundation of analysis and assessment about the investment risk and analyzed function of analysis and assessment about the investment risk explains its purpose and step. Continue article recommend the project investment risk analysis of the construction project and assess the method. On this basis, the article has intruded the method of analysis and assessment about the investment risk of construction project.Chapter four, is countermeasure analysis of the investment risk of the construction project. The article has expounded the concrete countermeasures of the investment risk of the construction project. These countermeasures include the risk lightening and risk shifting and the risk reserving and so on.Chapter five, is supervision and control of the investment risk of the construction project. The article has explained position and meaning of supervision and control of the investment risk of the construction project and probed into the method of supervision and control of the investment risk of the construction project. On this basis, the article and has further analyzed the implementation supervision and control of the investment risk of the construction project.Chapter six of the article is study for the case of management of investment risk of the construction project. Air liquide Zhejiang ASU project as an example, the article has carried on the positive research of the investment risk of construction project.
Keywords/Search Tags:risk management, engineering project, risk handle strategy
PDF Full Text Request
Related items