Font Size: a A A

Design Of The Optimize Production Operation And Management System To Lanzhou Power Company

Posted on:2008-06-28Degree:MasterType:Thesis
Country:ChinaCandidate:G X XuFull Text:PDF
GTID:2189360242459550Subject:Business Administration
Abstract/Summary:PDF Full Text Request
At present, enterprises of all types and the vast majority of the residents to break the monopoly of the power industry because of the impact of the social macroeconomic environment, providing services and lower electricity charges childish growing calls, the power companies will face many new opportunities and challenges, we must support policies in the past to rely on the market to seek internal resources and mining potential. Lanzhou Power Company as electricity sales 20 billion kwh of large state-owned enterprises, the current production operation management system can no longer meet the objective of economic and social development requirements. Therefore, the need for production operation management system optimized. This article through to analysis Lanzhou Power Company existing production operation management system's present situation, discovers the existence question of the operation management system management system, analyzes each kind of objective requests to the electric power production and the service environment, established the principle and the goal of Lanzhou Power Company to produce which the operation management system management system optimized, made again take the flow with the information management system application as the optimized main method, linked to the Lanzhou Power Company camp effect management reality, separately to the electrical network capital construction management system management system, the production technology and the equipment movement management system management system, the electrical energy sale service system as well as the production assistance management system management system carried on the optimized design, prepared from the hardware to the optimized mentality, Constructs from the system to the procedure determined that, established both has been realistic, and moderate in advance optimization design proposal. This plan implementation, to will enhance the company to produce the operation efficiency, the promotion high-quality service level, the development electric power sells the market, will reduce the enterprise movement cost, and will speedup the enterprise to develop the positive role.
Keywords/Search Tags:Production, operation, Urgency, Process Reengineering Information, Management System, Project management Performance Assessment
PDF Full Text Request
Related items