Font Size: a A A

Design Of Bid Alternative And Feasibility Analysis Of Success Towards Beidahu Weak Electricity Project

Posted on:2007-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:Z H ZhangFull Text:PDF
GTID:2189360212959574Subject:Business Administration
Abstract/Summary:PDF Full Text Request
From construction in1983 in America, intelligent building has been made prompt progress and become the mainstream because it can provide convenient, comfortable, efficient and energy-saving living condition. The intelligence of building is carried out by way of weak-electricity technology, so intelligent project is called weak-electricity project. Because of high technology, long term and complexity of weak-electricity system, there are many problems during design and execution. Using of bid, the contractors can be selected well; the intelligence of building can be carried out by reasonable price.Bid is a systematic and forgoing work. Every bidder should take part in the whole procedure according to process. Or the bidding will be rejected. To do well on bidding, the bidders should devote fine equipments, organize talents, pay attention to vital works, harmonize relationship with tenderee, edit bidding document according to demand strictly, analyze market and competitive situation, make suitable bidding policy and do other works well.When designing bid alternative, bidder should do well in following aspects: answer all the demand of user; analyze bid documents, alternatives and methods; think of things standing on users; offer technology proposal towards cost; apply project management technique when editing work procedure; investigate detail information of project and market; understand user's demand and prior factor; use exist experience when editing bid documents; make great effort on project management and find out possible problems and preventive method, and solve related problems through cooperation with bidders and user.Some principles should be followed when design bid alternative, such as: meet user's demand, economic and reasonable, advanced, mature and applied, open and standard, reliable and stable and so on.Before the design of bid alternative, bidder should analyze project's...
Keywords/Search Tags:Beidahu, Weak-electricity project, Bid, Design of alternative
PDF Full Text Request
Related items