Font Size: a A A

The Qingdao Cigarettes Factory Number Collect System Project Risk Administration Studies

Posted on:2011-01-28Degree:MasterType:Thesis
Country:ChinaCandidate:S L ZhangFull Text:PDF
GTID:2189330332963829Subject:Project management
Abstract/Summary:PDF Full Text Request
Data acquisition system is a modern enterprise digital, mechanization, automation, increasingly, the background came into being, and in production management plays an increasingly important role. Data Collection System project the more in-depth,increasing the potential risk along with it,risk management,project development and management has become an important part of the work.Therefore,targeted research data collection system project risk factors and effective risk management and control of the project on enhancing the success rate, improve enterprise management level and economic benefits of great significance.This article on the paper bag plant in Qingdao Cigarette Factory Data Acquisition System project risk management of the project,the tobacco industry of industrial enterprises for the smooth implementation of project data acquisition system has some precedent.Based on the study and reference on the basis of a large number of domestic and foreign literature, the paper bag plant in Qingdao Cigarette Factory Data Collection System project implementation risk factors,risk identification and risk assessment system was studied.In combination with paper bag plant in Qingdao Cigarette Factory Data Collection System project of the actual situation of the risk assessment,risk assessment on the results of an in-depth analysis and elaboration of risk prevention and control measures and conducted in-depth study and discussion.In this paper, empirical analysis and research, made the following findings and conclusions:First,the use of risk management and risk assessment of theoretical knowledge theoretical system, combined volume of Qingdao Cigarette Factory workshop for data acquisition system implementation case of the research project,the project implementation process of the preparation,implementation, post-management of risk factors for the three phases to identify and reveal the causes of risks, in-depth analysis of its characteristics and mechanism.Secondly, this two-dimensional matrix used as a tool of the Qingdao Cigarette Factory Data Collection System the whole process of implementation of the project risk analysis and risk factors obtained in all the risk factors for all-round foundation for risk identification.Again, this paper paper bag plant in Qingdao Cigarette Factory Data Collection System project in the whole process in three stages, corresponding to explore and Sheji the risk assessment system for the risk assessment, Li Yongduo phase of AHP (MS-AHP) Jinxingshuju Jian model, combined with paper bag plant in Qingdao Cigarette Factory Data Collection System project of two real options analysis of the results of risk assessment, completed the whole process of the project risk assessment.Finally, this paper also paper bag plant in Qingdao Cigarette Factory Data Collection System project risk prevention were studied. This is for the cigarette companies to control data acquisition system project implementation risk and improve the data acquisition system, the tobacco companies the success rate of investment has played a positive role model.Given my limited knowledge and research capabilities, the article, there are many areas for improvement. Lacks and weaknesses, but also please the teachers, experts and students for their valuable comments and suggestions.
Keywords/Search Tags:Tobacco companies, Data Acquisition System, Risk management, risk assessment, AHP
PDF Full Text Request
Related items