Font Size: a A A

Planning And Control To HDTV Equipment Updating Project In CCTV-7 Agriculture Channel

Posted on:2012-09-04Degree:MasterType:Thesis
Country:ChinaCandidate:Q XuFull Text:PDF
GTID:2189330332497113Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
This article is based on that Planning and control to HDTV equipment updating project in CCTV-7 agriculture channel for research object,research the existing facilities about the agricultrral program,analyzes the existing problems at first,concluding the analysis results that we must promote the equipment update about the HDTV equipment of the agricultrral channel.Then,realizing the particularity about the project background,the project execution time,project investment quota and project quality goal standard etc all have strict requirement limits,and the agriculture programs lack of experience in similar large projict management so we must reasonable proceed the project scheduling,and effectively carry out the course contral to ensure the project implemente smoothly.and then,clear the necessary about the project's carried out proceed science plan and control then in-depth analysis and resrarch at last.In the specific compiling process project plan,confirm the project's global aims and the project schedule, cost, quality of specific goals,Then define the project's specific scope.Through the methords of work flowchart on analysis and WBS work resolve structure,formed a detailed and clear executable plan for the project,divides the project phase,confirms the specific task,clear the relationship about the project participants and department.then consider the project management and the departments of the relationship between the daily function management,established matrix project management organization form,and set up 5 projects special working groups,clear the responsiblity about the project group,greatly improve the efficiency of the project management. The project into concrete implementation phase,the essential question that we concerned is how to control the project's carried out effectively,The specific to the schedule of the project, cost and quality three key factors for management of important control,to ensure the project control method and reliable operation.First through seven time schedule sub-targets setting,Divided into four progress stage,established four milestones events,and for this schedule control premise,To establish the dynamic cycle of level 3 schedule control management system,useing total schedule control,master schedule control,A detailed schedule control of 3-rated schedule control method,to ensure the aim completed within the specific time,realized the project schedule control;At second,through the scientific and reasonable estimation of the project costing and confirm more accurate cost control goals,In-depth analysis and find the key of the cost control,targeted for bidding,construction and settlement and proceed the key administrative process, to achieve the goal that project cost control within budget request the project cost control purposes;The third,Build up "PDCA" cycle as the guiding ideology of quality control system,through the determination of quality control basis,then formulate the project shall implement the standards of quality, on the basis of quality control documents compiled with,And in the project plan to control the whole process effectively carry out quality meeting,subject meeting,through the above quality control concrete operation standard and method,make the project's quality control realization in technical indicators or whatever in management parameters,all can achieve quality goals.In order to ensure the effectiveness of the project control,in project management process,Also established the project risk management mechanism,through risk identification,estimate,analysing,looking for avoid the risk,the methords for the control the risks,avoid or reduce the risk to the project's influence.At the same time,establishing the project check organization,through the project periodically review,analysis the project appeared deviation,the reason of the deviation,making plan about the deviation,writing a review report,to guarantee the project plan target towards progressing smoothly and always in control.In the final stage of the project,by the strict project completion acceptance,and complete the projects end of report, the results of project completed are summarized and evaluation.This article through to in that planning and control in agriculture channal HDTV equipment updating project process,influence of project implementation of some key factors are analyzed and studied,summarize ,concluded some methords in favour of improve the project management level of work ideas.This article of agriculture programs of HDTV equipment renewal project plan and control,starting from the actual needs of project,combined with the project itself and project execution unit's specific characteristics,the project plan is comprehensive,project control more reasonable and effective,it is actively for the item completed according the plan.Meanwhile,also hope that the relevant items of this project,and the next project for agriculture programs accumulate experience and scientific management,and the management of projects similar to the practical reference work for reference.
Keywords/Search Tags:HDTV equipment, project management, planning and control
PDF Full Text Request
Related items