With shenzhen dongshen engineering Co., LTD. (hereinafter referred to as:shenzhen dongshen engineering company), continuous innovation and development of shenzhen dongshen engineering company has become the guangdong province city and inter-city water supply network connection project leading companies, urban water supply network and inter-city water supply network connection pipe-jacking also gradually become shenzhen dongshen engineering company's main business. How to urban water supply network, inter-city water supply network connecting pipe jacking project construction process of the cost for effective control is very important, for the rapid development of shenzhen dongshen engineering company is of far-reaching significance.Based on research project cost management theory, the shenzhen dongshen engineering company's complete case-shenzhen and Hong Kong inter-city water network pipe jacking project to study and analysis, an in-depth investigation and study the project construction site, the cost control theory combined with practical, found between shenzhen and Hong Kong inter-city water network project construction cost pipe jacking in existing problems in management, and puts forward the corresponding solutions, main contents of the following:(1) the case of case:introduced main subject construction enterprise -- shenzhen dongshen engineering Co., LTD, case subjects construction craft, shenzhen-Hong Kong inter-city water supply network of pipe jacking technology, the main project-shenzhen case-Hong Kong inter-city water pipe jacking project network are introduced.(2) project construction cost control theory analysis, from the following six aspects were discussed in detail:the project construction cost control concept, The project construction cost control, Project construction cost control of content, Project construction cost control principle, Project construction cost control procedures, Project construction cost control method.(3) combined with shenzhen-Hong Kong inter-city water-supply pipe network (slurry balance pipe jacking construction characteristics of roadheader), project construction as the guidance, the general goal from the bidding phase, construction preparation stage, the construction phase, project completion settlement stages and project construction cost control process and implementation plan.Through the shenzhen-Hong Kong inter-city water supply network pipe jacking project cost control case study, improve the construction project construction enterprise management level of construction cost control, optimization of the project construction cost control of management process, but also for future inter-city water pipe jacking construction project of network cost control laid a solid theoretical foundation construction, help to reduce the construction management of construction enterprise cost, profit maximization of economic goals. |