Study On The Quality Control Of Rjeenovation Proct Of Delayed Coking Furnace

Posted on:2016-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:S S LiFull Text:PDF
GTID:2181330467979540Subject:Project management
Abstract/Summary:PDF Full Text Request
The quality problems of chemical project (continue industry) is a major problem. Because of the characteristics of chemical equipment under high pressure, high temperature and medium run under the flammable explosive, the device in the construction and reformation, quality assurance is very important.In this paper, based on delayed coking furnace reconstruction project construction is modeled, using management theory and advanced methods of analysis around the refinery quality management and control in the premise of safety, stable and low cost, the theory related to quality management, project quality management for the study and research, and on this basis undertook bold exploration and practice:one is according to the general theory of project quality management, and refinery particularity, the particularity of refinery construction project quality management are analyzed, and the method of systematic measures should be adopted in each stage of quality management in refinery construction project quality control, quality control content, characteristics construction project. Two is an important factor affecting the delayed coking furnace replacement project quality were analyzed, and with the theory analysis result as the quality control plan is effective, the introduction of three, the three phase of the quality management theory, Jilin Petrochemical Co quality management system, proposed the delayed coking furnace heat exchanger to replace the construction project quality control scheme.At the same time to the project and the procedure, each independent unit according to the management methods of PDCA were closed management, and also the implementation of incentive mechanism of excellent engineering project selection, puts forward the construction site civilized construction positive effect on refinery construction project quality, in the field of quality management of refinery construction projects to achieve a new exploration and try.Quality control method of the paper study and put forward delay coking furnace reconstruction project, to achieve the organic combination of the advanced management theory and production practice, has received the good effect, has provided a powerful guarantee for the quality control of construction projects.
Keywords/Search Tags:Delayed coking furnace, rjeenovation proct, study on the quality control
PDF Full Text Request
Related items