Font Size: a A A

The Research On The Management Mode Of WuLing Hydropower Plant

Posted on:2007-08-14Degree:MasterType:Thesis
Country:ChinaCandidate:G Z NiuFull Text:PDF
GTID:2179360182988605Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
At present, with the rapid development of electrical Power industry and the reformation of the market economy system in our country, our electric power business enterprise management processes a series of reformation correspondingly. On the foundation of the former experiences, the research on the power station management model is becoming more perfect. This text makes a deeper research on the management mode of WuLing hydropower plant.1. The paper introduces the management mode and the exteriors of the power station of water. According to the characteristics of Wu Ling hydropower plant, the paper sets up the way of changes and the whole frame, expatiates the basic characteristic of the power station, makes sure the management target of the power station of water.2. The paper makes researches on the organization construction and the member standard, gives the near period mode and the long-term mode of the market marketing, the human resource management, the finance management, the material management and exterior relation management, sets up the member standard of the preparing stage and the constructing stage for the engineering.3. The operation flow charts and the operation running modes of the company and the power station are designed. At the company level, the paper makes a deeper research on the market marketing, the human resource management, the finance management, the material management and exterior relation management, but also establishes the management model of each section respectively. At the power station level, the paper sets up the mode of the electricity production management of the power station, production and preparation management and engineering construction management, and makes elaborate illustrations on the model.4 .The accomplishment evaluation system of the company is set up, which including KPI(key performance indexes) and the daily working checks. The paper also gives the basic standards, the index, the methods and the evaluation for KPI.
Keywords/Search Tags:hydropower plant, management mode, organization construction, member standard, operation flow, operation running mode, accomplishment evaluation system
PDF Full Text Request
Related items