Font Size: a A A

The Research Of Hydroelectric Project Flexible Process Control System Of Based On SOA

Posted on:2011-12-28Degree:MasterType:Thesis
Country:ChinaCandidate:Y W WangFull Text:PDF
GTID:2178360305952947Subject:Computer application technology
Abstract/Summary:
The business processes become increasingly complex with the changes in business environment, under which the traditional information system is unable to achieve the dynamic control flow. The information systems require frequent transformation when the business needs are changing. The appearance of service-oriented architecture and business process execution language makes it possible for the separation between the description of abstract business process logics and business process functions, which provide a theoretical and technical support for the research of flexible business management.The thesis aims at build a flexible business process management system that can dynamically control the hydropower projects, and makes an in-depth study on the related technologies about service-oriented and flexible process modeling. The author proposes the solution based on the SOA flexible workflow management system and applied it on the hydropower project management system. The experimental results show that the solutions of hydropower projects have realized the dynamic control of hydropower projects and self adoption of business process, achieving the improment of the system flexibility. Above all, The result of the paper has certain theoretical and application reference value.
Keywords/Search Tags:SOA, flexibility, process modeling, hydroelectric project program
Related items