| This paper has introduced the engineering project financing , traits of main facilities and complexion of technic alteration in the Rizhao Power Plant. Positive exploration and innovation that has formed by the limited ascending project financing without state assurance in the first time have been expound mainly in this paper .This paper has analyzed the positive effect of this financing mode on the cost of the project and advanced performance of equipment, index of technology and economy, and safety, economy and credibility of operation during the earlier operation. The effect of technology of the reform on coming to advance economy benefit and establish top-ranking operation level of power plants has been analyzed in this paper. Xie Shun(Power Engineering)Directed by prof:Jianxun Qi,Songling Wang... |