| Every nation in the world will face the crisis of oil shortage this century if there is not new discovery of oil fields with rich reserves.China is not exception. At present, on the one hand the conflict between demand and supply of oil is especially severe in china because of limited oil reserves and on the other hand Chinese coal supply exceeds its demand because of rich coal reserves,coal liquefaction is the important way to solve these two problems.To develop coal liquefaction is an important energy policy of china,chinese leaders have always been paying high attention to it.In this circumstance,the item of Yushen coal liquefaction base comes into being,but there are many problems to be solved on how to conduct this item.This thesis uses many kinds of theories and knowledges from many different subjects into practice, firstly analyzes the investment environment of this item,then expounds its producing capacity design, technology selection.construction pattern and plan schedule,estimates its static investment and the gross investment of Dabaodang liquefaction factory in the first stage which respectively has its financial evalution and national economy evalution to prove its feasibility.This thesis also designs the way of controlling investment of this item and expounds the system how to use computer to control the construction of this item. In the end,the thesis arrivals at some conclusions and proposes some pieces of instructive advice that are helpful to this item.This thesis is benitlcial to this item just like " rain in time" to dry crop. |