| In order to reduce coal consumption for thermal power supply, mining of existing thermal power units in energy-saving potential of the existing thermal power steam turbine flow path Rehabilitation, has become important to improve the thermal efficiency measures in the host. In this paper, Ma Tau power plant 220MW unit (8) for the study, explained the transformation of the former equipment unit through flow situation and existing problems, the need for reform of the Flow analysis, Flow transformation of part of the proposed modification technology program and principles, and reform content. After transformation of the Flow Performance Test data, technical studies, in-depth analysis of the different conditions of unit operation in the economy, Proposed energy conservation advice and technical measures. |