The urban comprehensive passenger transport terminal is the cross point of the various transport modes and the place where the travelers gather, disperse and transfer, the hub become large-scale, comprehensive and three-dimensional. With the railway and mass transit's great-leap-forward development, the new railway terminal in major cities has been positioned as a more integrated urban passenger hub, set railways, highways, urban mass transit, public transport, taxis, bicycles and other traffic in one way . Among all kinds of vehicle, it is the most proportion of railway and urban orbital-traffic transfer. With the development of urban orbital-traffic transfer web, it increases acutely. The efficiency of integrative passenger transport is decided by the link between railway and urban orbital-traffic transfer. In order to realize the conception of "focus on human being", ensure the best running of integrative passenger-traffic transport system and supply the convenient,safe,comfortable service to passengers, the thesis deeply set forth the problem between railway and urban orbital-traffic transfer.Firstly, the thesis researches the concept, thoughts, characters and evaluated principles and methods by the system, then which analyzes different characters and structural layout, last which deeply discover some main factors that impact the whole link-up system's evaluating index. The paper focuses on the specific method of transfer, in accordance with the principles of integration, the study of the flow rate of share forecast of the transport capacity between the space layout of the set, induced by the application of signs and traffic organization methods, At the same time, the time of the follow-up and operational management for the convergence of in-depth discussions.After the establishment of this article change the evaluation of the efficiency of the system and set of 11 indicators for evaluation, each of the indicators are carried out detailed analysis and application of fuzzy comprehensive evaluation of the combination of AHP for a comprehensive evaluation of the transfer system.Finally, the combination of Chengdu Station New River Fort analysis of the structure of the flow station, the passenger flow forecast of ideas and methods, organizations, people, and change the station evaluate the efficiency, come to the station for the efficient transfer of good conclusion.
|