| Along with speeding development of society economy, the situations of transportation in ChangChun are gradually getting better. Along with the exaltation of the highway mileage and grade, to the request of the passenger transportation station also be raising gradually, but smoe problems are still existing for instance, passenger transportation station widespread existence, parking area of the ChangChun is small, the vehicle organization adjust one degree difficult, the equipments is simple and crude, the service level implementation etc.《ChangChun highway main vital point total layout programming-1997》was approved by the national Ministry of Transportation & Communications. Make sure will return in KaiXuan Road passenger transportation station by setting up to help province biggest, the top-grade northeast, the domestic forerunner's passenger transportation station, become the comprehensive transportation vital core center that northern region in ChangChun. The construction that returns in KaiXuan the road passenger transportation station is advantageous to pulling to move the TieBei district economy development, optimizes the conveyance system, perfect ChangChun highway main core point, alleviate the passenger transportation master station pressure effectively, the reasonable reposition of redundant passengers transportation, quantity with organize passenger transportation efficiently, be advantageous to establish a unify, open, compete, have the passenger transportation market being ordered.This article carried on the possibility research in returning in KaiXuan Road passenger transportation station, completing item of necessity analysis; predict of the proper station quantity passenger transportation; The transportation influence analyze; The station address option and construction condition; The construction contents and project; The investment estimate and the finance evaluate etc.1. The passenger transportation station traffic volume predict. first is the present condition of national economy in analytical ChangChun City and social development and development trend, study social economy and the inside contact of the transportation. Make use of 1 item returns to return,2 items return to return mathematics model, the method that uses to settle sex fixed amount to combine together predicted the highway passenger transportation quantity. Second is base on the core station, north station, return in KaiXuan station operation number and circuit of adjustment project, combine existing core station, north station of the luck camp condition and traveler's discharge flow the line analysis, the adoption comparison analysis method estimate returns in KaiXuan a year of the road passenger transportation station estimate the highway passenger transportation quantity.(the trend type proper station quantity). Third is base on drawing up to set up the ChangChun railway station north station traveller's discharge of estimate, reference《ChangChun highway main vital point the total layout programming adjust a project》medium railroad passenger transportation quantity estimate part, analyze the estimate returns in KaiXuan the road passenger transportation station of railroad reposition of redundant personnel proper station quantity; Fourth, the reference country profession standard and the Ministry of Communications construct the road passenger depot the related standard, unifies the Changchun special details, to constitutes triumphal returns the road passenger depot facility, equipment scale each target makes the further forecast.2. The stations address option and construction condition. Originally for the service principle for"putting people first", satisfy travelers to transport the whole distance safety and comfort of request, stand according to the highway passenger transportation of choose the address principle and《"three north" in ChangChun City reform a total programming》, combine the passenger transportation station in ChangChun City of actual circumstance, draw up to choose the station address to locate to draw up to set up of north station in ChangChun City and the west side of the north square, the TieBei second road south side, return in KaiXuan the road east side, the TieBei all the way north side. Combine the synopsis introduced passenger transportation a station the address general situation, analyzing the niche advantage, introducing a construction condition.3. The road design projects. Introduced existing road condition, make use of the present condition analysis and the prospect analysis to combine together, the district analysis and the fixed-point analysis combine together, the quantitative analysis and qualitative analysis combine together of method, adopt the Trips software establishment mathematics model different contrast to carry on analysis to the network discharge, district discharge, the exit and entrance position, make sure the road programming of the periphery, and establish the appropriation parking district, promise the transportation safety valid.4. The construction project design. According to《the automobile passenger transportation station the building design norm》JGJ60 - 99 and《long highway in ChangChun main vital point total layout programming adjust project》put forward concrete construction project. Return in KaiXuan the road passenger transportation station wants to set up to help province to be biggest, the northeast is top-grade, the domestic forerunner's passenger transportation station, become modernization of comprehensive transportation vital point center. The body grows modernization city appearance in ChangChun now, the function is just reasonable, the transportation organization contain preface, the empty harbor type management, the environment personal status outstanding city civilization construction the demonstration window way. Have the traveler transports the organization management, win to turn, change to, many type through traffic, communication, information service, comprehensive service etc. function. Combine comprehensive consider constructing in the near future, usage and farsighted development of demand, get stripe reformation to reserve space of have the necessity for the future. Pass to flow the line (include a traveler to flow the line and vehicle to flow line) analysis to the passenger transportation process, passenger transportation, carry on passenger transportation to flow a line design. Act according to total layout programming in standard and ChangChun City of profession, carry on measuring to calculate to the main engineering contents, make sure it constructs the scale, flat surface decoration, structure to choose a type, publicly to use engineering etc.5. The finance evaluates. According to《the investment item possibility research guidebook》and finance and tax system, laws, policy, measure to calculate various data and parameter. Pass to estimate to the business income and the business tax gold, cost, the finance cash discharge analysis, indetermination analysis item finance the internal rate of return is big in the basic rate of return, finance the clean current value is big in zero of conclusion. his item sees can go completely from various economic index signs. |