| In recent years, along with our country the development of the national economy and town construction, The city took place the big variety in our country, Particularly it is the most young and direct jurisdiction city, now just be placed in the big development, big construction stage, a new skyscraper rises straight from the ground continuously. And in these impressive-looking many-storied buildings, also conceal the huge fire danger .Because the personnel, supplies concentrates highly, only have a little neglect the gist and can immediately bring about a fire,The result is the personnel dead or injured and economies lose.And the smoke spirit of a fire in the high rise buildings is also a important factor of endanger the personnel life.But now, while the designs carry on the fire design, usually paid attention to the design for the fire of the building, the drain and electricity, and neglected to the design of Smoke management system. In this style ,the writer according to the experience that the oneself construction engineering fire examine, combine the fire technical regulation of 《Code for Fire Protection Design of Tall Buiding 》, 《Code for Fire Protection Design of Buiding 》, 《Code for Fire Protection Design of civil air defend works 》etc., Detailedly anatomize the normal problem of the smoke management system design in the fire examine, Analyse the problem's reason , Point the ways of overcom and correct them; Home discuss and research the lack of the active code, To the zeropoint and some list of active code existent probleme, Putting forward the reasonable modification suggestion;At the same time ,To defend and line up the smoke problem of some concrete engineerings carries on the study, Research, and carry on compare or analytical to some defend to line up the smoke method ,To expect and can get the design project of a kind of reasonable in concrete design, To provide some reference way of thinkings for the defend to line up the smoke design aftertime. Finally the writer still passes to the treatise of the process and check in a specific way in the examine for function to turn the design of the super norm building-the exhibition building of international meeting exhibition center of chongqing, To function turned to design the method of our country to carry on the thorough research study, Providing reference to how hold the function to turn to design exactituded of examine. |