Font Size: a A A

Analysis And Study Of Platen Superheater Overtemperature Of No.5 Boiler Of Zou Xian Power Plant

Posted on:2005-12-24Degree:MasterType:Thesis
Country:ChinaCandidate:X H WangFull Text:PDF
GTID:2132360122496326Subject:Power Engineering
Abstract/Summary:PDF Full Text Request
The calculation results of the heat absorption and the steam flow rate, and the wall temperature of platen superheater tubes for 600MW boiler in Zouxian power plant are given. According to calculation results and online monitoring datum, the reasons of overtemperature of some tubes in platen superheater are analyzed. A proposal solving this problem is given.
Keywords/Search Tags:Platen superheater, overtemperature, calculation
PDF Full Text Request
Related items