This paper mainly discusses a method for multi-goal network's optimization and control.Since the network plan was brought forward , the criterion for evaluating network has been time, cost, resource, quality all along. In this paper , through massive study on achievement the predecessors has done, the author posed a new way. Simultaneously , the author establish the network's multi-goal model by synthesizing the existing optimum models ,also find the finite not bad solution of the model ; Because the goals was in contradiction with each other , using the multi-goal decision theory can optimize the network project scientifically and objectively . Thus the optimum network can reflect the project overall requires and embody the project's total profits.In construction network's control , study on construction network administrator's annals, censor and adjust ,in order to satisfy with construction network's goals of time and resources equilibration will be accomplished. |